#914252
In the event of excessive leakage from the Reservoir taking place owing to the said intake or the works connected therewith or from any works under the control of the Corporation, the Corporation shall at its own expense forthwith carry out and execute such works to the satisfaction of the Board either in the vicinity of the intake and conduits, or elsewhere as the Board may require, as shall completely prevent or, if complete prevention is not reasonably possible, decrease the leakage to the minimum practical point.
In the event of excessive leakage from the Reservoir taking place owing to the said intake or the works connected therewith or from any works under the control of the Corporation, the Corporation shall at its own expense forthwith carry out and execute such works to the satisfaction of the Board either in the vicinity of the intake and conduits, or elsewhere as the Board may require, as shall completely prevent or, if complete prevention is not reasonably possible, decrease the leakage to the minimum practical point.