Gaois

Search direction

Search mode

Filter results

Collections

12 results in 3 documents

  1. #593992

    Maidir le leictreachas agus gás, chun go mbeadh siad incháilithe lena gcur sa dara liosta Aontais agus i liostaí Aontais ina dhiaidh sin, ba cheart go mbeadh na tionscadail ina gcuid den phlean 10 mbliana is déanaí atá ar fáil maidir le forbairt gréasáin.

    For electricity and gas, in order to be eligible for inclusion in the second and subsequent Union lists, projects should be part of the latest available 10-year network development plan.

    Regulation (EU) No 347/2013 of the European Parliament and of the Council of 17 April 2013 on guidelines for trans-European energy infrastructure and repealing Decision No 1364/2006/EC and amending Regulations (EC) No 713/2009, (EC) No 714/2009 and (EC) No 715/2009 Text with EEA relevance

  2. #594612

    an ENTSO le haghaidh Leictreachais i gcomhréir leis an modheolaíocht a chuirtear i bhfeidhm sa phlean 10 mbliana is déanaí atá ar fáil maidir le forbairt gréasáin le haghaidh tionscadal a thig faoi Iarscríbhinn II.1(a), (b) agus (d),

    the ENTSO for Electricity in line with the methodology applied in the latest available 10-year network development plan for projects falling under Annex II.1(a), (b) and (d),

    Regulation (EU) No 347/2013 of the European Parliament and of the Council of 17 April 2013 on guidelines for trans-European energy infrastructure and repealing Decision No 1364/2006/EC and amending Regulations (EC) No 713/2009, (EC) No 714/2009 and (EC) No 715/2009 Text with EEA relevance

  3. #594641

    Déanfar comhtháthú margaidh, íomaíochas agus solúbthacht an chórais a thomhas i gcomhréir leis an anailís arna déanamh sa phlean uile-Aontais 10 mbliana is déanaí atá ar fáil maidir le forbairt gréasáin leictreachais, go háirithe trí na nithe seo a leanas a dhéanamh:

    Market integration, competition and system flexibility shall be measured in line with the analysis made in the latest available Union-wide 10-year network development plan in electricity, notably by:

    Regulation (EU) No 347/2013 of the European Parliament and of the Council of 17 April 2013 on guidelines for trans-European energy infrastructure and repealing Decision No 1364/2006/EC and amending Regulations (EC) No 713/2009, (EC) No 714/2009 and (EC) No 715/2009 Text with EEA relevance

  4. #1802066

    torthaí an phlean forbartha gréasáin 10 mbliana don leictreachas a d'ullmhaigh ENTSO don Leictreachas;

    the results of the 10-year network development plan in electricity prepared by the ENTSO for Electricity;

    Regulation (EU) 2019/941 of the European Parliament and of the Council of 5 June 2019 on risk-preparedness in the electricity sector and repealing Directive 2005/89/EC (Text with EEA relevance.)

  5. #311231

    Tá ról tábhachtach á imirt ag an nGníomhaireacht agus ag an ENTSO don Ghás, in éineacht le rannpháirtithe eile sa mhargadh, i ndáil le bunú agus cur chun feidhme an phlean forbartha gréasáin 10 mbliana uile-Aontais, ar plean é ina n-áireofar, inter alia, tuar Eorpach ar leordhóthanacht an tsoláthair agus ar plean é ba cheart a bheith bunaithe, inter alia, a mhéid a bhaineann le hidirnaisc thrasteorann, ar riachtanais réasúnacha úsáideoirí éagsúla an líonra.

    The Agency and the ENTSO for Gas, together with other market participants, play an important role in the establishment and implementation of the Union-wide 10-year network development plan which will include, inter alia, a European supply adequacy outlook and, regarding cross-border interconnections, should, inter alia, build on the reasonable needs of different network users.

    Regulation (EU) No 994/2010 of the European Parliament and of the Council of 20 October 2010 concerning measures to safeguard security of gas supply and repealing Council Directive 2004/67/EC

  6. #311269

    Maidir leis an bplean forbartha gréasáin 10 mbliana uile-Aontais, arna tharraingt suas ag an ENTSO don Ghás faoi mhaoirseacht na Gníomhaireachta, is uirlis bhunúsach é chun na hinfheistíochtaí is gá ar leibhéal an Aontais a shainaithint, inter alia d’fhonn na riachtanais bhonneagair a leagtar síos sa Rialachán seo a chur chun feidhme.

    The Union-wide 10-year network development plan drawn up by the ENTSO for Gas and supervised by the Agency is a fundamental tool to identify the required investments needed at Union level, inter alia, in order to implement the infrastructure requirements laid down in this Regulation.

    Regulation (EU) No 994/2010 of the European Parliament and of the Council of 20 October 2010 concerning measures to safeguard security of gas supply and repealing Council Directive 2004/67/EC

  7. #311381

    2. Maidir leis na Pleananna Coisctheacha náisiúnta agus comhpháirteacha Gníomhaíochta, go háirithe na gníomhaíochtaí is gá chun an caighdeán bonneagair a leagtar síos in Airteagal 6 a shásamh, cuirfear san áireamh iontu an plean forbartha gréasáin deich mbliana uile-Aontais a bheidh le tarraingt suas ag an ENTSO don Ghás de bhun Airteagal 8(10) de Rialachán (CE) Uimh. 715/2009.

    2. The national and joint Preventive Action Plans, in particular the actions to meet the infrastructure standard as laid down in Article 6, shall take into account the Union-wide 10-year network development plan to be elaborated by the ENTSO for Gas pursuant to Article 8(10) of Regulation (EC) No 715/2009.

    Regulation (EU) No 994/2010 of the European Parliament and of the Council of 20 October 2010 concerning measures to safeguard security of gas supply and repealing Council Directive 2004/67/EC

  8. #594310

    Cuirfear na modheolaíochtaí sin i bhfeidhm chun gach plean 10 mbliana maidir le forbairt gréasáin ina dhiaidh sin a ullmhú arna fhorbairt ag an ENTSO le haghaidh Leictreachais nó an ENTSO le haghaidh Gáis de bhun Airteagal 8 de Rialachán (CE) Uimh. 714/2009 agus Airteagal 8 de Rialachán (CE) Uimh. 715/2009.

    Those methodologies shall be applied for the preparation of each subsequent 10-year network development plan developed by the ENTSO for Electricity or the ENTSO for Gas pursuant to Article 8 of Regulation (EC) No 714/2009 and Article 8 of Regulation (EC) No 715/2009.

    Regulation (EU) No 347/2013 of the European Parliament and of the Council of 17 April 2013 on guidelines for trans-European energy infrastructure and repealing Decision No 1364/2006/EC and amending Regulations (EC) No 713/2009, (EC) No 714/2009 and (EC) No 715/2009 Text with EEA relevance

  9. #594609

    Tar éis chéad liosta an Aontais a ghlacadh, do na liostaí Aontais go léir a ghlacfar ina dhiaidh sin, beidh tionscadail bheartaithe tarchurtha agus stórála leictreachais a thig faoi na catagóirí atá leagtha amach in Iarscríbhinn II.1(a), (b) agus (d) ina gcuid den phlean 10 mbliana is déanaí atá ar fáil maidir le forbairt gréasáin do leictreachas, arna fhorbairt ag an ENTSO le haghaidh Leictreachais de bhun Airteagal 8 de Rialachán (CE) Uimh. 714/2009.

    After adoption of the first Union list, for all subsequent Union lists adopted, proposed electricity transmission and storage projects falling under the categories set out in Annex II.1(a), (b) and (d) shall be part of the latest available 10-year network development plan for electricity, developed by the ENTSO for Electricity pursuant Article 8 of Regulation (EC) No 714/2009.

    Regulation (EU) No 347/2013 of the European Parliament and of the Council of 17 April 2013 on guidelines for trans-European energy infrastructure and repealing Decision No 1364/2006/EC and amending Regulations (EC) No 713/2009, (EC) No 714/2009 and (EC) No 715/2009 Text with EEA relevance

  10. #594610

    Tar éis chéad liosta an Aontais a ghlacadh, do na liostaí Aontais go léir a ghlacfar ina dhiaidh sin, beidh na tionscadail bheartaithe bonneagair gáis a thig faoi na catagóirí atá leagtha amach in Iarscríbhinn II.2 ina gcuid den phlean 10 mbliana is déanaí atá ar fáil maidir le forbairt gréasáin do ghás, arna fhorbairt ag an ENTSO le haghaidh Gáis de bhun Airteagal 8 de Rialachán (CE) Uimh. 715/2009.

    After adoption of the first Union list, for all subsequent Union lists adopted, proposed gas infrastructure projects falling under the categories set out in Annex II.2 shall be part of the latest available 10-year network development plan for gas, developed by the ENTSO for Gas pursuant Article 8 of Regulation (EC) No 715/2009.

    Regulation (EU) No 347/2013 of the European Parliament and of the Council of 17 April 2013 on guidelines for trans-European energy infrastructure and repealing Decision No 1364/2006/EC and amending Regulations (EC) No 713/2009, (EC) No 714/2009 and (EC) No 715/2009 Text with EEA relevance

  11. #594644

    Déanfar tarchur giniúna fuinnimh in-athnuaite chuig mórionaid ídithe agus chuig láithreáin stórála a thomhas i gcomhréir leis an anailís arna déanamh sa phlean 10 mbliana is déanaí atá ar fáil maidir le forbairt gréasáin leictreachais, go háirithe trí na nithe seo a leanas a dhéanamh:

    Transmission of renewable energy generation to major consumption centres and storage sites shall be measured in line with the analysis made in the latest available 10-year network development plan in electricity, notably by:

    Regulation (EU) No 347/2013 of the European Parliament and of the Council of 17 April 2013 on guidelines for trans-European energy infrastructure and repealing Decision No 1364/2006/EC and amending Regulations (EC) No 713/2009, (EC) No 714/2009 and (EC) No 715/2009 Text with EEA relevance

  12. #594647

    Déanfar cinnteacht an tsoláthair idir-inoibritheacht agus slándáil na hoibríochta córais a thomhas i gcomhréir leis an anailís arna déanamh sa phlean 10 mbliana is déanaí atá ar fáil maidir le forbairt gréasáin leictreachais, go háirithe trí mheasúnú a dhéanamh ar thionchar an tionscadail ar chaillteanas an ionchais ualaigh don limistéar anailíse atá sainithe in Iarscríbhinn V.10 maidir le leordhóthanacht giniúna agus tarchuir i sraith tréimhsí ualaigh saintréitheacha, ag cur san áireamh aon athruithe a bhfuiltear ag súil leo i dteagmhais aimsire crua a bhaineann leis an aeráid agus an tionchar a bheadh acu sin ar sheasmhacht an bhonneagair.

    Security of supply, interoperability and secure system operation shall be measured in line with the analysis made in the latest available 10-year network development plan in electricity, notably by assessing the impact of the project on the loss of load expectation for the area of analysis as defined in Annex V.10 in terms of generation and transmission adequacy for a set of characteristic load periods, taking into account expected changes in climate-related extreme weather events and their impact on infrastructure resilience.

    Regulation (EU) No 347/2013 of the European Parliament and of the Council of 17 April 2013 on guidelines for trans-European energy infrastructure and repealing Decision No 1364/2006/EC and amending Regulations (EC) No 713/2009, (EC) No 714/2009 and (EC) No 715/2009 Text with EEA relevance