Gaois

Search direction

Search mode

Filter results

Collections

249 results in 56 documents

  1. #2009005

    Féadfaidh BB ról an BB Freagrach agus/nó an BB Pleanála a ghlacadh

    An IM can assume the roles Responsible IM and/or Planning IM

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  2. #2008995

    Glacann BB atá bainteach ann ról an BB Pleanála.

    The involved IM assumes the role Planning IM.

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  3. #1064964

    Foirm an Mhionna nó an Dearbhuithe a ghlacfas nó a dhéanfas Fir a Liostálfas sna Buan-Óglaigh faoi alt 53.

    FORM OF OATH OR DECLARATION TO BE TAKEN OR MADE BY MEN ENLISTING IN THE PERMANENT DEFENCE FORCE UNDER SECTION 53. [GA] PART I [GA] Mionnaímse (nó dearbhaímse),................................................................................, go solamanta go mbead dílis d'Eirinn agus tairiseach don Bhunreacht agus, faid a bhead im fhear d'Oglaigh na hEireann, go gcomhlíonfad gach ordú dleathach a bhéarfas m'oifigigh uachtaracha dhom agus, faid a bhead im fhear de na Buan-Oglaigh, nach gceanglód le haon eagraíocht nó cumann polaitíochta ná le haon chumann rúnda ar bith ná nach mbead im chomhalta den chéanna ná nach dtaobhód leis an gcéanna agus, má bhím im fhear de na hOglaigh Cúltaca, nach gceanglód le haon chumann rúnda ar bith ná nach mbead im chomhalta den chéanna ná nach dtaobhód leis an gcéanna faid a bhead im fhear de na hOglaigh Cúltaca. [GA]

    Number 18 of 1954: DEFENCE ACT, 1954

  4. #2948394

    Saineoidh BB, i gcomhairle leis na GInna atá ag oibriú ar a líonra, na nósanna imeachta iomchuí nuair nach dtarchuirfear modhnú ar Leabhar na mBealaí ó BB chuig GI san uainiú comhaontaithe iomchuí, mar a shainítear in CBS BB agus mar a léirítear in CBS GI; sa chás sin, cuirfidh an BB féin an tiománaí ar an eolas freisin.

    The IM, in consultation with the RUs operating on its network, shall define the appropriate procedures when modification of the Route Book is not transmitted from the IM to RU in the appropriate agreed timing, as defined in the SMS of the IM and reflected in the SMS of the RU; in that case, the IM shall also directly inform the driver.

    Commission Implementing Regulation (EU) 2023/1693 of 10 August 2023 amending Implementing Regulation (EU) 2019/773 on the technical specification for interoperability relating to the operation and traffic management subsystem of the rail system within the European Union (Text with EEA relevance)

  5. #3192672

    Údaruithe maidir le próiseáil isteach EX/IM nó próiseáil amach EX/IM a úsáid lena mbaineann Ballstát amháin nó níos mó agus údaruithe maidir le próiseáil isteach IM/EX nó próiseáil amach IM/EX a úsáid lena mbaineann Ballstát amháin nó níos mó, áireofar iontu na hoibleagáidí dá bhforáiltear in Airteagal 176(1).

    Authorisations for the use of inward processing EX/IM or outward processing EX/IM which involve one or more than one Member State and authorisations for the use of inward processing IM/EX or outward processing IM/EX which involve more than one Member State shall include the obligations provided for in Article 176(1).

    Commission Delegated Regulation (EU) 2024/249 of 30 November 2023 amending Delegated Regulation (EU) 2015/2446 as regards common data requirements for the purposes of exchange and storage of certain information under the customs legislation

  6. #590386

    IM = suim iomlán an chorrlaigh tosaigh a chuireann an contrapháirtí lárnach in iúl don institiúid;

    IM = the total amount of initial margin communicated to the institution by the CCP.

    Regulation (EU) No 575/2013 of the European Parliament and of the Council of 26 June 2013 on prudential requirements for credit institutions and investment firms and amending Regulation (EU) No 648/2012 Text with EEA relevance

  7. #1799784

    IM i = an corrlach tosaigh arna bhreacadh ag comhalta imréitigh i leis an gcontrapháirtí lárnach;

    IM i = the initial margin posted with the CCP by clearing member i;

    Regulation (EU) 2019/876 of the European Parliament and of the Council of 20 May 2019 amending Regulation (EU) No 575/2013 as regards the leverage ratio, the net stable funding ratio, requirements for own funds and eligible liabilities, counterparty credit risk, market risk, exposures to central counterparties, exposures to collective investment undertakings, large exposures, reporting and disclosure requirements, and Regulation (EU) No 648/2012 (Text with EEA relevance.)

  8. #1924959

    IM : Le haghaidh trádáil le tíortha agus le críocha atá suite lasmuigh de chríoch chustaim an Aontais.

    IM : For trade with countries and territories situated outside of the customs territory of the Union.

    Commission Implementing Regulation (EU) 2021/235 of 8 February 2021 amending Implementing Regulation (EU) 2015/2447 as regards formats and codes of common data requirements, certain rules on surveillance and the competent customs office for placing goods under a customs procedure

  9. #2008489

    Seolfaidh BB/CL atá ag gníomhú mar an BB Pleanála an teachtaireacht “sonraí bealaigh” chuig an GI/Iarratasóir iarrthach mar fhreagairt ar a Iarraidh ar Bhealach.

    The IM/AB acting as Planning IM shall send the ‘Path Details message’ to the requesting RU/Applicant in response to its Path Request.

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  10. #2008501

    Seolfaidh BB/CL, a ghlacann ról an BB Pleanála (i gcéim na pleanála) nó ról an BB Fhreagraigh (i bhfeidhm) an teachtaireacht “Níl bealach ar fáil” chuig GI/an iarratasóir ar conradh i gcás nach bhfuil an bealach a dheimhnigh an GI/an t-iarratasóir ar fáil a thuilleadh.

    The IM/AB assuming the role Planning IM (in planning phase) or in the role Responsible IM (in operation) shall send the ‘Path Not Available message’ to the contracted RU/Applicant in the event that the Path confirmed by the RU/Applicant is no longer available.

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  11. #2008508

    Murab ann do thogra malartach, ní mór do BB GI a chur ar an eolas láithreach.

    If an alternative proposal is not possible, the IM must inform the RU immediately.

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  12. #2008530

    Seolfaidh an GI a sholáthraíonn tarraingt do phointe iontrála BB an teachtaireacht “go bhfuil traein réidh” chuig an GI a oibríonn an tseirbhís traenach ar líonra BB.

    The RU providing traction to the IM entry point shall send the ‘train ready’ message to the RU operating the train service on the IM network.

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  13. #2008545

    Ina theannta sin, ní mór do BB an teachtaireacht a eisiúint chuig GI le haghaidh pointí tuairiscithe eile de réir conarthaí GI/BB.

    In addition, the message must be issued by the IM to the RU for other reporting points according the RU/IM contracts.

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  14. #2008553

    Ina theannta sin, ní mór do BB an “teachtaireacht maidir le Faisnéis faoi Ghluaiseacht Traenach” a eisiúint chuig an GI Freagrach ag na hamanna seo a leanas:

    The ‘Train Running Information message’ must be issued by the IM to the Responsible RU upon:

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  15. #2008563

    Má chuirtear isteach ar an ngluaiseacht traenach, eisíonn BB an teachtaireacht seo chuig an gcéad bhainisteoir bonneagair comharsanachta eile a bhfuil baint aige leis an ngluaiseacht traenach agus chuig an GI Freagrach.

    If the train is interrupted, the IM issues this message to the next neighbouring IM involved in the train run and to the Responsible RU.

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  16. #2008779

    Comhéadan coiteann um chumarsáid GI/BB

    Common interface for RU/IM communication

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  17. #2008980

    Am Aistrithe Measta traenach ó BB amháin go BB eile.

    Estimated Time of Handover of a train from one IM to another.

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  18. #2009006

    Bainisteoir bonneagair (BB)

    Infrastructure manager (IM)

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  19. #2009007

    Féach BB

    See IM

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  20. #2009008

    Pointe Iontrála BB

    IM Entry Point

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  21. #2009010

    Pointe Fágála BB

    IM Exit Point

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  22. #2009011

    Cuid ina bhfágann traein IT an líonra deireanach poiblí BB agus ina dtéann sí isteach sa chríochfort cinn scríbe

    Section where the CT train leaves the last public IM network and enters the arrival terminal

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  23. #2009081

    BB pleanála

    Planning IM

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  24. #2009086

    Féach BB Pleanála

    See Planning IM

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  25. #2009100

    BB Freagrach

    Responsible IM

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  26. #2009105

    Is é GIF an t-eintiteas teagmhála do BB i gcéim oibríochta le haghaidh an mhalartaithe teachtaireachtaí ar fad.

    The RRU is the contact entity for the IM in operation phase for all message exchange.

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  27. #2009160

    Soláthraí sliotáin (BB),

    Slot provider (IM),

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  28. #2009161

    Rialtóir traenach (BB),

    Train controller (IM),

    Commission Implementing Regulation (EU) 2021/541 of 26 March 2021 amending Regulation (EU) No 1305/2014 as regard the simplification and improvement of data calculation and exchange and the update of the Change Control Management process (Text with EEA relevance)

  29. #2040177

    Im - I0 - 12 mhí

    Im – I0 – 12 months

    Commission Delegated Regulation (EU) 2021/702 of 10 December 2020 amending Delegated Regulation (EU) 2015/2195 on supplementing Regulation (EU) No 1304/2013 of the European Parliament and of the Council on the European Social Fund, regarding the definition of standard scales of unit costs and lump sums for reimbursement of expenditure by the Commission to Member States

  30. #2080170

    Na cathracha agus na bardais seo a leanas in Rems-Murr-Kreis: Alfdorf, Allmersbach im Tal, Althütte, Auenwald, Großerlach, Kaisersbach, Murrhardt, Plüderhausen, Rudersberg, Schorndorf, Sulzbach a.d. Murr, Urbach, Weissach im Tal, Welzheim, Winterbach, Berglen, Remshalden

    The following cities and municipalities in Rems-Murr-Kreis: Alfdorf, Allmersbach im Tal, Althütte, Auenwald, Großerlach, Kaisersbach, Murrhardt, Plüderhausen, Rudersberg, Schorndorf, Sulzbach a.d. Murr, Urbach, Weissach im Tal, Welzheim, Winterbach, Berglen, Remshalden

    Commission Implementing Regulation (EU) 2021/1008 of 21 June 2021 amending Annex I to Implementing Regulation (EU) 2021/620 as regards the disease-free status of Croatia and a region of Portugal from infection with Brucella abortus, B. melitensis and B. suis in bovine animal populations, amending Annex VIII thereto as regards the disease-free status of Lithuania and certain regions of Germany, Italy and Portugal from infection with bluetongue virus (serotypes 1-24) and amending Annex XIII thereto as regards the disease-free status of Denmark and Finland from infectious haematopoietic necrosis (Text with EEA relevance)

  31. #2253578

    Dieser nordöstlich durch den Wald folgend und im weiteren über Am Horstberg bis Bundesstraße 72, dieser nördlich folgend bis Ziegeldamm, entlang diesem bis Ziegelmoor, entlang dieser bis Friesoyther Straße, dieser in westlicher Richtung bis Hinter Schlingshöhe folgend, dieser nordwestlich und im Weiteren Cavens - an der Gabelung östlich - bis zum Verbindungsweg zum Kündelweg folgend, diesem und im Weiteren Kündelweg bis zum Waldrand folgend, diesem erst östlich, dann südlich und dann wieder östlich bis Am Kündelsberg und dem parallel verlaufenden Kündemoorgraben folgend, diesem beziehungsweise dem Wasserverlauf erst nördlich und dann nordwestlich bis Kündelweg folgend, diesem und im Weiteren zu den Jücken erst nordöstlich und dann nordwestlich bis Riege Wolfstange folgend, dieser in östlicher Richtung bis zur Gemeindegrenze Stadt Friesoythe/Gemeinde Bösel folgend, dieser in westlicher Richtung bis Vehnemoor Graben folgend, dem Wasserverlauf in östlicher bis Overlahe Graben folgend, dem Wasserverlauf in nördlicher und dann in östlicher Richtung bis zur Kreisgrenze zum Landkreis Ammerland folgend, dieser östlich folgend und über die Kreisgrenze zum Landkreis Oldenburg bis zum Ausgangspunkt.

    Dieser nordöstlich durch den Wald folgend und im weiteren über Am Horstberg bis Bundesstraße 72, dieser nördlich folgend bis Ziegeldamm, entlang diesem bis Ziegelmoor, entlang dieser bis Friesoyther Straße, dieser in westlicher Richtung bis Hinter Schlingshöhe folgend, dieser nordwestlich und im Weiteren Cavens – an der Gabelung östlich – bis zum Verbindungsweg zum Kündelweg folgend, diesem und im Weiteren Kündelweg bis zum Waldrand folgend, diesem erst östlich, dann südlich und dann wieder östlich bis Am Kündelsberg und dem parallel verlaufenden Kündemoorgraben folgend, diesem beziehungsweise dem Wasserverlauf erst nördlich und dann nordwestlich bis Kündelweg folgend, diesem und im Weiteren zu den Jücken erst nordöstlich und dann nordwestlich bis Riege Wolfstange folgend, dieser in östlicher Richtung bis zur Gemeindegrenze Stadt Friesoythe/Gemeinde Bösel folgend, dieser in westlicher Richtung bis Vehnemoor Graben folgend, dem Wasserverlauf in östlicher bis Overlahe Graben folgend, dem Wasserverlauf in nördlicher und dann in östlicher Richtung bis zur Kreisgrenze zum Landkreis Ammerland folgend, dieser östlich folgend und über die Kreisgrenze zum Landkreis Oldenburg bis zum Ausgangspunkt.

    Commission Implementing Decision (EU) 2022/623 of 11 April 2022 amending Implementing Decision (EU) 2021/641 concerning emergency measures in relation to outbreaks of highly pathogenic avian influenza in certain Member States (notified under document C(2022) 2454) (Text with EEA relevance)

  32. #2256145

    ar a dtugtar freisin IM Song-Sun

    a.k.a. IM Song-Sun

    Council Decision (CFSP) 2022/661 of 21 April 2022 amending Decision (CFSP) 2016/849 concerning restrictive measures against the Democratic People’s Republic of Korea

  33. #2354843

    ar a dtugtar freisin IM Song-Sun

    a.k.a. IM Song-Sun

    Council Implementing Regulation (EU) 2022/659 of 21 April 2022 implementing Regulation (EU) 2017/1509 concerning restrictive measures against the Democratic People’s Republic of Korea

  34. #2403815

    Die Überwachungszone besteht im Landkreis Osterholz aus den Gemeinden Lübberstedt, Axstedt und Holste.

    Die Überwachungszone besteht im Landkreis Osterholz aus den Gemeinden Lübberstedt, Axstedt und Holste.

    Commission Implementing Decision (EU) 2022/1320 of 26 July 2022 amending the Annex to Implementing Decision (EU) 2021/641 concerning emergency measures in relation to outbreaks of highly pathogenic avian influenza in certain Member States (notified under document C(2022) 5471) (Text with EEA relevance)

  35. #2498492

    Cineál (PSM, ESM, IM, SRM)…

    Type (PSM, ESM, IM, SRM)…

    Commission Regulation (EU) 2022/1379 of 5 July 2022 amending Regulation (EU) 2017/2400 as regards the determination of the CO2 emissions and fuel consumption of medium and heavy lorries and heavy buses and to introduce electric vehicles and other new technologies (Text with EEA relevance)

  36. #2531978

    Méid na risíochta ar phriacal maidir le Priacail suímh, malairte eachtraí agus tráchtearraí faoi shamhlacha inmheánacha (IM)

    Risk exposure amount for Position, foreign exchange and commodities risks under internal models (IM)

    Commission Implementing Regulation (EU) 2022/1994 of 21 November 2022 amending the implementing technical standards laid down in Implementing Regulation (EU) 2021/451 as regards own funds, asset encumbrance, liquidity and reporting for the purposes of identifying global systemically important institutions (Text with EEA relevance)

  37. #2533050

    C 24.00 – SAMHLACHA INMHEÁNACHA I LEITH PRIACAL MARGAIDH (MKR IM)

    C 24.00 - MARKET RISK INTERNAL MODELS (MKR IM)

    Commission Implementing Regulation (EU) 2022/1994 of 21 November 2022 amending the implementing technical standards laid down in Implementing Regulation (EU) 2021/451 as regards own funds, asset encumbrance, liquidity and reporting for the purposes of identifying global systemically important institutions (Text with EEA relevance)

  38. #2533344

    C 24.00 - SAMHAIL INMHEÁNACH I LEITH PRIACAL MARGAIDH (MKR IM)

    C 24.00 - MARKET RISK INTERNAL MODEL (MKR IM)

    Commission Implementing Regulation (EU) 2022/1994 of 21 November 2022 amending the implementing technical standards laid down in Implementing Regulation (EU) 2021/451 as regards own funds, asset encumbrance, liquidity and reporting for the purposes of identifying global systemically important institutions (Text with EEA relevance)

  39. #2533725

    Méid na risíochta ar phriacal maidir le priacail suímh, malairte eachtraí agus tráchtearraí faoi shamhlacha inmheánacha (IM)

    Risk exposure amount for positions, foreign exchange and commodity risks under internal models (IM)

    Commission Implementing Regulation (EU) 2022/1994 of 21 November 2022 amending the implementing technical standards laid down in Implementing Regulation (EU) 2021/451 as regards own funds, asset encumbrance, liquidity and reporting for the purposes of identifying global systemically important institutions (Text with EEA relevance)

  40. #2533726

    Féach teimpléad MKR IM

    See MKR IM template

    Commission Implementing Regulation (EU) 2022/1994 of 21 November 2022 amending the implementing technical standards laid down in Implementing Regulation (EU) 2021/451 as regards own funds, asset encumbrance, liquidity and reporting for the purposes of identifying global systemically important institutions (Text with EEA relevance)

  41. #2675430

    Gemarkungen Brehmen, Brohna, Camina, Crosta, Droben, Großdubrau, Lomske, Luppa, Luttowitz und Teile der Gemarkungen Lippitsch: Bereich südlich der S101 bis Gemarkungsgrenze am Grenzgraben, Milkel: Bereich südlich der S101, Oppitz: Bereich südlich der im östlichen Gemarkungsbereich liegenden S101, westlich begrenzt durch den Feldweg, der auf die Gemarkungsgrenze Luppa (Waldstück Arabien) mündet, Quatitz: gesamter Bereich nördlich der S107 (Luttowitzer Straße) und westlich der K7210 (Großdubrauer Straße), Radibor: im Osten - Bereich nördlich der K7211 (Caminaer Straße), Bereich nördlich der Verbindungsstraße zwischen Caminaer Straße und Lilienstraße bis zur Gemarkungsgrenze Brohna sowie im Westen - Bereich nördlich des alten Bahndammes bis Gemarkungsgrenze Quoos, Sdier: Bereich westlich der Teiche Großteich und Oberer Großteich sowie Feld- und Waldbereich „Am Forsthaus“, östlich des Mädelteichs

    Gemarkungen Brehmen, Brohna, Camina, Crosta, Droben, Großdubrau, Lomske, Luppa, Luttowitz und Teile der Gemarkungen Lippitsch: Bereich südlich der S101 bis Gemarkungsgrenze am Grenzgraben, Milkel: Bereich südlich der S101, Oppitz: Bereich südlich der im östlichen Gemarkungsbereich liegenden S101, westlich begrenzt durch den Feldweg, der auf die Gemarkungsgrenze Luppa (Waldstück Arabien) mündet, Quatitz: gesamter Bereich nördlich der S107 (Luttowitzer Straße) und westlich der K7210 (Großdubrauer Straße), Radibor: im Osten – Bereich nördlich der K7211 (Caminaer Straße), Bereich nördlich der Verbindungsstraße zwischen Caminaer Straße und Lilienstraße bis zur Gemarkungsgrenze Brohna sowie im Westen – Bereich nördlich des alten Bahndammes bis Gemarkungsgrenze Quoos, Sdier: Bereich westlich der Teiche Großteich und Oberer Großteich sowie Feld- und Waldbereich „Am Forsthaus“, östlich des Mädelteichs

    Commission Implementing Decision (EU) 2023/9 of 20 December 2022 amending the Annex to Implementing Decision (EU) 2021/641 concerning emergency measures in relation to outbreaks of highly pathogenic avian influenza in certain Member States (notified under document C(2022) 9934) (Text with EEA relevance)

  42. #2721953

    Im Ochsensand, 9470 Buchs An Eilvéis

    Im Ochsensand, 9470 Buchs Switzerland

    Commission Implementing Regulation (EU) 2023/402 of 22 February 2023 granting a Union authorisation for the biocidal product family ‘CMIT/MIT SOLVENT BASED’ in accordance with Regulation (EU) No 528/2012 of the European Parliament and of the Council (Text with EEA relevance)

  43. #2754696

    Dáta formheasta tosaigh samhla inmheánaí

    Date of initial approval of IM

    Commission Implementing Regulation (EU) 2023/894 of 4 April 2023 laying down implementing technical standards for the application of Directive 2009/138/EC of the European Parliament and the Council with regard to the templates for the submission by insurance and reinsurance undertakings to their supervisory authorities of information necessary for their supervision and repealing Implementing Regulation (EU) 2015/2450 (Text with EEA relevance)

  44. #2754697

    Dáta formheasta an mhórathraithe is déanaí ar an tsamhail inmheánach

    Date of approval of latest major change of IM

    Commission Implementing Regulation (EU) 2023/894 of 4 April 2023 laying down implementing technical standards for the application of Directive 2009/138/EC of the European Parliament and the Council with regard to the templates for the submission by insurance and reinsurance undertakings to their supervisory authorities of information necessary for their supervision and repealing Implementing Regulation (EU) 2015/2450 (Text with EEA relevance)

  45. #2763181

    9 — Gan tuairisc tugtha toisc go n-úsáidtear samhail inmheánach iomlán (“IM”)

    9 – Not reported due to use of full internal model (‘IM’)

    Commission Implementing Regulation (EU) 2023/894 of 4 April 2023 laying down implementing technical standards for the application of Directive 2009/138/EC of the European Parliament and the Council with regard to the templates for the submission by insurance and reinsurance undertakings to their supervisory authorities of information necessary for their supervision and repealing Implementing Regulation (EU) 2015/2450 (Text with EEA relevance)

  46. #2850200

    D.21– IM-0

    IM-0

    Commission Implementing Regulation (EU) 2023/1226 of 22 June 2023 amending Annexes V, XIV and XV to Implementing Regulation (EU) 2021/404 as regards the entries for Canada, Chile and the United Kingdom in the lists of third countries authorised for the entry into the Union of consignments of poultry, germinal products of poultry and fresh meat of poultry and game birds (Text with EEA relevance)

  47. #2875825

    Wolfram Bergbau und Hütten AG, Mittersill agus Sankt Martin im Sulmtal, an Ostair.

    Wolfram Bergbau und Hütten AG, Mittersill and Sankt Martin im Sulmtal, Austria

    Commission Implementing Regulation (EU) 2023/1618 of 8 August 2023 imposing a definitive anti-dumping duty on imports of tungsten carbide, fused tungsten carbide and tungsten carbide simply mixed with metallic powder originating in the People’s Republic of China following an expiry review pursuant to Article 11(2) of Regulation (EU) 2016/1036 of the European Parliament and of the Council

  48. #2948369

    (b) I gcás BB:

    (b) for the IM:

    Commission Implementing Regulation (EU) 2023/1693 of 10 August 2023 amending Implementing Regulation (EU) 2019/773 on the technical specification for interoperability relating to the operation and traffic management subsystem of the rail system within the European Union (Text with EEA relevance)

  49. #2948371

    (iii) Treoracha a thabhairt don fhoireann a dhéanann cúraimí atá ríthábhachtach ó thaobh na sábháilteachta de a leagtar síos ina CBS;

    (iii) IM instructions to the staff executing safety-critical tasks laid down in its SMS;

    Commission Implementing Regulation (EU) 2023/1693 of 10 August 2023 amending Implementing Regulation (EU) 2019/773 on the technical specification for interoperability relating to the operation and traffic management subsystem of the rail system within the European Union (Text with EEA relevance)

  50. #2948372

    (iv) faisnéis atá ábhartha maidir leis na feithiclí a oibríonn BB nuair is infheidhme agus nuair nach bhfuil BB ag gníomhú mar GI; agus

    (iv) information relevant to the vehicles operated by the IM when applicable and when the IM is not acting as an RU; and

    Commission Implementing Regulation (EU) 2023/1693 of 10 August 2023 amending Implementing Regulation (EU) 2019/773 on the technical specification for interoperability relating to the operation and traffic management subsystem of the rail system within the European Union (Text with EEA relevance)