Gaois

Search direction

Search mode

Filter results

Collections

50 results in 34 documents

  1. #1958211

    Comhar maidir le fuinneamh inathnuaite amach ón gcósta a fhorbairt

    Cooperation in the development of offshore renewable energy

    Trade and Cooperation Agreement between the European Union and the European Atomic Energy Community, of the one part, and the United Kingdom of Great Britain and Northern Ireland, of the other part

  2. #2451874

    Ina theannta sin, éilítear leis sin dlús a chur leis an infheistíocht san fhuinneamh in-athnuaite amach ón gcósta agus é mar aidhm aige sin 300 GW ar a laghad de ghiniúint gaoithe amach ón gcósta a bhaint amach a shuiteáiltear i gcomhréir le straitéis an Choimisiúin maidir le fuinneamh in-athnuaite amach ón gcósta a leagtar amach i dteachtaireacht ón gCoimisiún an 19 Samhain 2020 dar teideal An EU Strategy to harness the potential of offshore renewable energy for a climate neutral future [Straitéis AE chun leas a bhaint as acmhainneacht an fhuinnimh in-athnuaite amach ón gcósta do thodhchaí a bheidh neodrach ó thaobh aeráide de].

    In addition, that requires stepping up investment in offshore renewable energy with the aim of reaching at least 300 GW of offshore wind generation installed in line with the Commission’s offshore renewable energy strategy set out in the Commission communication of 19 November 2020 entitled ‘An EU Strategy to harness the potential of offshore renewable energy for a climate neutral future’.

    Regulation (EU) 2022/869 of the European Parliament and of the Council of 30 May 2022 on guidelines for trans-European energy infrastructure, amending Regulations (EC) No 715/2009, (EU) 2019/942 and (EU) 2019/943 and Directives 2009/73/EC and (EU) 2019/944, and repealing Regulation (EU) No 347/2013

  3. #2636460

    Straitéis Fuinnimh In-athnuaite Amach ón gCósta;

    Offshore Renewable Energy Strategy;

    COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE EUROPEAN COUNCIL, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS CONFERENCE ON THE FUTURE OF EUROPE Putting Vision into Concrete Action

  4. #2940694

    Ba cheart saintréithe na dtionscadal fuinnimh in-athnuaite amach ón gcósta a chur san áireamh agus na sprioc-amanna sin á socrú.

    The particularities of offshore renewable energy projects should be taken into account when setting those deadlines.

    Directive (EU) 2023/2413 of the European Parliament and of the Council of 18 October 2023 amending Directive (EU) 2018/2001, Regulation (EU) 2018/1999 and Directive 98/70/EC as regards the promotion of energy from renewable sources, and repealing Council Directive (EU) 2015/652

  5. #2940665

    Tá gá le spás a leithdháileadh ar thionscadail fuinnimh in-athnuaite amach ón gcósta i bpleananna spásúla muirí chun gur féidir pleanáil fhadtéarmach a dhéanamh, chun measúnú a dhéanamh ar an tionchar atá ag na tionscadail fuinnimh in-athnuaite amach ón gcósta sin agus chun a áirithiú go nglacfaidh an pobal leis an imscaradh atá beartaithe dóibh.

    Allocating space for offshore renewable energy projects in maritime spatial plans is needed to enable long-term planning, to assess the impact of those offshore renewable energy projects and to ensure public acceptance of their planned deployment.

    Directive (EU) 2023/2413 of the European Parliament and of the Council of 18 October 2023 amending Directive (EU) 2018/2001, Regulation (EU) 2018/1999 and Directive 98/70/EC as regards the promotion of energy from renewable sources, and repealing Council Directive (EU) 2015/652

  6. #2941059

    Ar bhonn na spriocanna táscacha do ghiniúint fuinnimh in-athnuaite amach ón gcósta atá le himscaradh laistigh de gach imchuach farraige, arna sainaithint i gcomhréir le hAirteagal 14 de Rialachán (AE) 2022/869, foilseoidh na Ballstáit lena mbaineann faisnéis faoi mhéideanna an fhuinnimh in-athnuaite amach ón gcósta atá beartaithe acu a bhaint amach trí thairiscintí, agus an fhéidearthacht theicniúil agus eacnamaíoch don bhonneagar eangaí agus na gníomhaíochtaí atá ar siúl cheana á gcur san áireamh.

    On the basis of the indicative goals for offshore renewable energy generation to be deployed within each sea basin, identified in accordance with Article 14 of Regulation (EU) 2022/869, the Member States concerned shall publish information on the volumes of offshore renewable energy that they plan to achieve through tenders, taking into account technical and economic feasibility for the grid infrastructure and the activities that already take place.

    Directive (EU) 2023/2413 of the European Parliament and of the Council of 18 October 2023 amending Directive (EU) 2018/2001, Regulation (EU) 2018/1999 and Directive 98/70/EC as regards the promotion of energy from renewable sources, and repealing Council Directive (EU) 2015/652

  7. #2941947

    Trí fhaisnéis a fhoilsiú faoi mhéideanna an fhuinnimh in-athnuaite amach ón gcósta atá beartaithe ag na Ballstáit a bhaint amach trí thairiscintí, méadaítear trédhearcacht agus intuarthacht d’infheisteoirí agus tacaítear leis na spriocanna do ghiniúint fuinnimh in-athnuaite amach ón gcósta a bhaint amach.

    Publishing information on the volumes of offshore renewable energy that the Member States intend to achieve through tenders increases transparency and predictability for investors and supports the achievement of the goals for offshore renewable energy generation.

    Directive (EU) 2023/2413 of the European Parliament and of the Council of 18 October 2023 amending Directive (EU) 2018/2001, Regulation (EU) 2018/1999 and Directive 98/70/EC as regards the promotion of energy from renewable sources, and repealing Council Directive (EU) 2015/652

  8. #1958212

    Oibreoidh na Páirtithe i gcomhar lena chéile maidir le fuinnimh inathnuaite amach ón gcósta a fhorbairt trí dhea-chleachtais a roinnt lena chéile agus, i gcás inarb iomchuí, trí fhorbairt tionscadal sonrach a éascú.

    The Parties shall cooperate in the development of offshore renewable energy by sharing best practices and, where appropriate, by facilitating the development of specific projects.

    Trade and Cooperation Agreement between the European Union and the European Atomic Energy Community, of the one part, and the United Kingdom of Great Britain and Northern Ireland, of the other part

  9. #2281103

    Ina theannta sin, tá sé mar aidhm ag an gCoimisiún toilleadh gaoithe amach ón gcósta a threisiú trí Straitéis an Aontais Eorpaigh maidir le Fuinneamh Inathnuaite Muirí d’fhonn sprioc an Aontais maidir le neodracht aeráide a bhaint amach faoi 2050.

    In addition, the Commission aims to boost offshore wind capacity through the EU Strategy on Offshore Renewable Energy in order to meet the EU’s goal of climate neutrality by 2050.

    Commission Implementing Regulation (EU) 2022/58 of 14 January 2022 imposing a definitive anti-dumping duty on imports of certain grain-oriented flat-rolled products of silicon-electrical steel originating in the People’s Republic of China, Japan, the Republic of Korea, the Russian Federation and the United States of America following an expiry review pursuant to Article 11(2) of Regulation (EU) 2016/1036 of the European Parliament and of the Council

  10. #2881791

    Le cur chun feidhme an Chomhaontaithe Trádála agus Comhair i réimse an fhuinnimh, díríodh ar chomhar maidir le slándáil agus soláthar a neartú, creat um chomhar maidir le fuinneamh inathnuaite amach ón gcósta a bhunú agus socruithe nua trádála leictreachais a fhorbairt.

    The implementation of the TCA in the area of energy focused on strengthening cooperation on security of supply, establishing a framework for offshore renewable energy cooperation and developing new electricity trading arrangements.

    REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the implementation and application of the Trade and Cooperation Agreement between the European Union and the United Kingdom of Great Britain and Northern Ireland 1 January – 31 December 2022

  11. #2933285

    Tá sé ríthábhachtach an eangach leictreachais a leathnú, le haghaidh tarchur agus dáileadh araon, chun dlús a chur le cur in úsáid an bhonneagair fuinnimh inathnuaite ar tír mhór agus amach ón gcósta araon.

    The expansion of the electricity grid, for both transmission and distribution, is essential to speed up the deployment of both onshore and offshore renewable energy infrastructure.

    Council Recommendation of 14 July 2023 on the 2023 National Reform Programme of the Netherlands and delivering a Council opinion on the 2023 Stability Programme of the Netherlands

  12. #2940666

    Trí rannpháirtíocht na gcomhphobal fuinnimh in-athnuaite a chumasú i dtionscadail chomhpháirteacha maidir le fuinneamh in-athnuaite amach ón gcósta, cuirtear tuilleadh bealaí ar fáil chun glacadh ag an bpobal a fheabhsú.

    Enabling the participation of renewable energy communities in joint projects on offshore renewable energy provides a further means by which to enhance public acceptance.

    Directive (EU) 2023/2413 of the European Parliament and of the Council of 18 October 2023 amending Directive (EU) 2018/2001, Regulation (EU) 2018/1999 and Directive 98/70/EC as regards the promotion of energy from renewable sources, and repealing Council Directive (EU) 2015/652

  13. #2941060

    Féachfaidh na Ballstáit leis an spás a leithdháileadh ar thionscadail fuinnimh in-athnuaite amach ón gcósta ina gcuid pleananna spásúla muirí, agus na gníomhaíochtaí atá ar siúl cheana sna limistéir a ndéantar difear dóibh á gcur san áireamh.

    Member States shall endeavour to allocate space for offshore renewable energy projects in their maritime spatial plans, taking into account the activities that already take place in the affected areas.

    Directive (EU) 2023/2413 of the European Parliament and of the Council of 18 October 2023 amending Directive (EU) 2018/2001, Regulation (EU) 2018/1999 and Directive 98/70/EC as regards the promotion of energy from renewable sources, and repealing Council Directive (EU) 2015/652

  14. #2941187

    Mar sin féin, i gcás tionscadail fuinnimh in-athnuaite amach ón gcósta, ní rachaidh an nós imeachta um dheonú ceadanna thar thréimhse 2 bhliain.

    However, in the case of offshore renewable energy projects, the permit-granting procedure shall not exceed two years.

    Directive (EU) 2023/2413 of the European Parliament and of the Council of 18 October 2023 amending Directive (EU) 2018/2001, Regulation (EU) 2018/1999 and Directive 98/70/EC as regards the promotion of energy from renewable sources, and repealing Council Directive (EU) 2015/652

  15. #2941217

    Mar sin féin, i gcás tionscadail fuinnimh in-athnuaite amach ón gcósta, ní rachaidh an nós imeachta um dheonú ceadanna thar thréimhse 3 bliana.

    However, in the case of offshore renewable energy projects, the permit-granting procedure shall not exceed three years.

    Directive (EU) 2023/2413 of the European Parliament and of the Council of 18 October 2023 amending Directive (EU) 2018/2001, Regulation (EU) 2018/1999 and Directive 98/70/EC as regards the promotion of energy from renewable sources, and repealing Council Directive (EU) 2015/652

  16. #2941971

    Chun feabhas a chur ar an méid a nglacann an pobal leis sin, féadfaidh na Ballstáit comhphobail fuinnimh in-athnuaite a áireamh i dtionscadail chomhpháirteacha fuinnimh in-athnuaite amach ón gcósta.’

    In order to enhance public acceptance, Member States may include renewable energy communities in joint offshore renewable energy projects.’

    Directive (EU) 2023/2413 of the European Parliament and of the Council of 18 October 2023 amending Directive (EU) 2018/2001, Regulation (EU) 2018/1999 and Directive 98/70/EC as regards the promotion of energy from renewable sources, and repealing Council Directive (EU) 2015/652

  17. #3058853

    Cuireann uaillmhian na mBallstát fuinneamh in-athnuaite amach ón gcósta a chur in úsáid (111 GW faoi 2030) i dtreis gur gá do na Ballstáit eangacha ríthábhachtacha amach ón gcósta a fhorbairt go pras mar aon le hatreisiú riachtanach na heangaí ar tír.

    Member States’ ambition to deploy offshore renewable energy (111 GW by 2030) underlines the need for Member States to swiftly develop crucial offshore grids and the necessary onshore grid reinforcements.

    COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN CENTRAL BANK, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE, THE COMMITTEE OF THE REGIONS AND THE EUROPEAN INVESTMENT BANK 2023 European Semester - Spring Package

  18. #3180866

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final

    Communication on European Wind Power Action Plan COM (2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM (2023) 668 final.

    Commission Recommendation (EU) 2024/596 of 18 December 2023 on the draft updated integrated national energy and climate plan of Denmark covering the period 2021-2030 and on the consistency of Denmark’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  19. #3181014

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final

    Communication on European Wind Power Action Plan COM(2023) 669 final, 24.10.2023, and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final.

    Commission Recommendation (EU) 2024/597 of 18 December 2023 on the draft updated integrated national energy and climate plan of Portugal covering the period 2021–2030 and on the consistency of Portugal’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  20. #3181193

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final.

    Communication on European Wind Power Action Plan COM (2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM (2023) 668 final.

    Commission Recommendation (EU) 2024/598 of 18 December 2023 on the draft updated integrated national energy and climate plan of Romania covering the period 2021-2030 and on the consistency of Romania’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  21. #3181361

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final

    Communication on European Wind Power Action Plan COM(2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final.

    Commission Recommendation (EU) 2024/599 of 18 December 2023 on the draft updated integrated national energy and climate plan of Italy covering the period 2021-2030 and on the consistency of Italy’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  22. #3181494

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final.

    Communication on European Wind Power Action Plan COM(2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final.

    Commission Recommendation (EU) 2024/600 of 18 December 2023 on the draft updated integrated national energy and climate plan of Spain covering the period 2021-2030 and on the consistency of Spain’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  23. #3181674

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final.

    Communication on European Wind Power Action Plan COM(2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final.

    Commission Recommendation (EU) 2024/603 of 18 December 2023 on the draft updated integrated national energy and climate plan of Czechia covering the period 2021-2030 and on the consistency of Czechia’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  24. #3181870

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final

    Communication on European Wind Power Action Plan COM (2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM (2023) 668 final

    Commission Recommendation (EU) 2024/606 of 18 December 2023 on the draft updated integrated national energy and climate plan of Estonia covering the period 2021-2030 and on the consistency of Estonia’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  25. #3182079

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final.

    Communication on European Wind Power Action Plan COM(2023) 669 final, 24.10.2023, and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final.

    Commission Recommendation (EU) 2024/609 of 18 December 2023 on the draft updated integrated national energy and climate plan of Malta covering the period 2021-2030 and on the consistency of Malta’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  26. #3182275

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final.

    Communication on European Wind Power Action Plan COM(2023) 669 final, 24.10.2023, and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final.

    Commission Recommendation (EU) 2024/611 of 18 December 2023 on the draft updated integrated national energy and climate plan of France covering the period 2021-2030 and on the consistency of France’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  27. #3182436

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final

    Communication on European Wind Power Action Plan COM(2023) 669 final, 24.10.2023, and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final.

    Commission Recommendation (EU) 2024/612 of 18 December 2023 on the draft updated integrated national energy and climate plan of Germany covering the period 2021-2030 and on the consistency of Germany’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  28. #3182575

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final.

    Communication on European Wind Power Action Plan COM(2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final.

    Commission Recommendation (EU) 2024/613 of 18 December 2023 on the draft updated integrated national energy and climate plan of Lithuania covering the period 2021-2030 and on the consistency of Lithuania’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  29. #3182746

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final

    Communication on European Wind Power Action Plan COM(2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final.

    Commission Recommendation (EU) 2024/615 of 18 December 2023 on the draft updated integrated national energy and climate plan of Hungary covering the period 2021-2030 and on the consistency of Hungary’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  30. #3182891

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final

    Communication on European Wind Power Action Plan, COM(2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final

    Commission Recommendation (EU) 2024/616 of 18 December 2023 on the draft updated integrated national energy and climate plan of the Netherlands covering the period 2021-2030 and on the consistency of Netherlands’ measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  31. #3183055

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final

    Communication on European Wind Power Action Plan, COM(2023) 669 final, 24.10.2023, and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final.

    Commission Recommendation (EU) 2024/617 of 18 December 2023 on the draft updated integrated national energy and climate plan of Slovakia covering the period 2021-2030 and on the consistency of Slovakia’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  32. #3183214

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final.

    Communication on European Wind Power Action Plan COM (2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM (2023) 668 final.

    Commission Recommendation (EU) 2024/618 of 18 December 2023 on the draft updated integrated national energy and climate plan of Sweden covering the period 2021-2030 and on the consistency of Sweden’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  33. #3183391

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final

    Communication on European Wind Power Action Plan, COM(2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final

    Commission Recommendation (EU) 2024/620 of 18 December 2023 on the draft updated integrated national energy and climate plan of Croatia covering the period 2021-2030 and on the consistency of Croatia’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  34. #3183623

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final

    Communication on European Wind Power Action Plan, COM(2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final.

    Commission Recommendation (EU) 2024/623 of 18 December 2023 on the draft updated integrated national energy and climate plan of Cyprus covering the period 2021-2030 and on the consistency of Cyprus’ measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  35. #3183794

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final

    Communication on European Wind Power Action Plan, COM(2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final

    Commission Recommendation (EU) 2024/627 of 18 December 2023 on the draft updated integrated national energy and climate plan of Greece covering the period 2021-2030 and on the consistency of Greece’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  36. #3183931

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final.

    Communication on European Wind Power Action Plan COM (2023) 669 final, 24.10.2023, and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final.

    Commission Recommendation (EU) 2024/629 of 18 December 2023 on the draft updated integrated national energy and climate plan of Finland covering the period 2021-2030 and on the consistency of Finland’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  37. #3184060

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final

    Communication on European Wind Power Action Plan COM (2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM (2023) 668 final.

    Commission Recommendation (EU) 2024/631 of 18 December 2023 on the draft updated integrated national energy and climate plan of Luxembourg covering the period 2021-2030 and on the consistency of Luxembourg’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  38. #3184232

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final

    Communication on European Wind Power Action Plan, COM(2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final.

    Commission Recommendation (EU) 2024/637 of 18 December 2023 on the draft updated integrated national energy and climate plan of Slovenia covering the period 2021-2030 and on the consistency of Slovenia’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  39. #3184744

    Ba cheart idirnaisc le bonneagair chriticiúla eile a chur san áireamh san athbhreithniú, go háirithe cáblaí leictreachais, píblínte gáis agus suiteálacha fuinnimh inathnuaite amach ón gcósta, chomh maith le bonneagair teileachumarsáide eile.

    The review should account for interrelations with other critical infrastructures, in particular electricity cables, gas pipelines and offshore renewable energy installations, as well as other telecommunications infrastructures.

    Commission Recommendation (EU) 2024/779 of 26 February 2024 on Secure and Resilient Submarine Cable Infrastructures

  40. #2281104

    Thuar Straitéis an Aontais maidir le Fuinneamh Inathnuaite Muirí amach ón gcósta méadú ar thoilleadh gaoithe amach ó chósta na hEorpa óna leibhéal reatha de 12 GW go 60 GW ar a laghad faoi 2030 agus go 300 GW faoi 2050.

    The EU Strategy on Offshore Renewable Energy projected an increase in Europe’s offshore wind capacity from its current level of 12 GW to at least 60 GW by 2030 and to 300 GW by 2050.

    Commission Implementing Regulation (EU) 2022/58 of 14 January 2022 imposing a definitive anti-dumping duty on imports of certain grain-oriented flat-rolled products of silicon-electrical steel originating in the People’s Republic of China, Japan, the Republic of Korea, the Russian Federation and the United States of America following an expiry review pursuant to Article 11(2) of Regulation (EU) 2016/1036 of the European Parliament and of the Council

  41. #2368527

    Foráiltear leis an gComhaontú Trádála agus Comhair freisin do chomhar maidir le fuinneamh inathnuaite amach ón gcósta a fhorbairt, atá le ról lárnach a bheith aige maidir le glanspriocanna nialasacha an dá pháirtí a bhaint amach i dtaca lena n-astaíochtaí gás ceaptha teasa.

    The TCA also provides for cooperation in the development of offshore renewable energy, which is due to play a key role in meeting both parties' net zero targets for their greenhouse gas emissions.

    REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the implementation and application of the Trade and Cooperation Agreement between the European Union and the United Kingdom of Great Britain and Northern Ireland 1 January – 31 December 2021

  42. #2451880

    Ba cheart do Bhallstáit ábhartha a bheith in ann measúnú a dhéanamh ar na tairbhí agus na costais a bhaineann leis na conairí tosaíochta eangaí amach ón gcósta le haghaidh fuinneamh in-athnuaite agus réamhanailís a dhéanamh ar chomhroinnt costas ar leibhéal na conaire tosaíochta eangaí amach ón gcósta chun taca a chur faoi ghealltanais pholaitiúla chomhpháirteacha maidir le forbairt fuinnimh in-athnuaite amach ón gcósta.

    Relevant Member States should be able to assess the benefits and costs of the priority offshore grid corridors for renewable energy and carry out a preliminary cost-sharing analysis at priority offshore grid corridor level to underpin joint political commitments for offshore renewable energy development.

    Regulation (EU) 2022/869 of the European Parliament and of the Council of 30 May 2022 on guidelines for trans-European energy infrastructure, amending Regulations (EC) No 715/2009, (EU) 2019/942 and (EU) 2019/943 and Directives 2009/73/EC and (EU) 2019/944, and repealing Regulation (EU) No 347/2013

  43. #2452468

    an dul chun cinn atá déanta i dtéarmaí comhtháthaithe foinsí fuinnimh in-athnuaite, lena n-áirítear foinsí fuinnimh in-athnuaite amach ón gcósta, agus astaíochtaí gás ceaptha teasa laghdaithe trí phleanáil, forbairt, tógáil agus coimisiúnú tionscadal atá ar liosta an Aontais;

    the progress achieved in terms of integration of renewable energy sources, including offshore renewable energy sources, and reduced greenhouse gas emissions through the planning, development, construction and commissioning of projects on the Union list;

    Regulation (EU) 2022/869 of the European Parliament and of the Council of 30 May 2022 on guidelines for trans-European energy infrastructure, amending Regulations (EC) No 715/2009, (EU) 2019/942 and (EU) 2019/943 and Directives 2009/73/EC and (EU) 2019/944, and repealing Regulation (EU) No 347/2013

  44. #2635124

    Baineann roinnt céimeanna cómháistir Erasmus Mundus go díreach le saincheisteanna maidir leis an athrú aeráide, mar shampla an chéim máistir san aeráid uirbeach agus san inbhuanaitheacht, as a dtagann céimithe éirimiúla ar féidir leo an athléimneacht aeráide i gcathracha a thuiscint, measúnú a dhéanamh uirthi agus í a bhainistiú chun maireachtáil ar domhan atá 1.5 °C níos teo, agus an chéim máistir san fhuinneamh inathnuaite sa chomhshaol muirí, atá saincheaptha chun riachtanais ag cuideachtaí i réimse an fhuinnimh inathnuaite eischósta a chomhlíonadh, agus ag a mbeidh dearcadh idirnáisiúnta a mbeidh comhpháirtíocht dhíreach ó lárionaid taighde den scoth, fiontair bheaga agus mheánmhéide agus cuideachtaí móra laistigh den tionscal mar bhonn taca faoi, mar chomhpháirtithe comhlacha.

    Several Erasmus Mundus joint master’s degrees relate directly to climate-change issues, for example the master of urban climate and sustainability, which produces high-calibre graduates who can understand, assess and manage climate resilience in cities to live in a world that is 1.5 °C warmer, and the master in renewable energy in the marine environment, which is tailored to meet companies’ needs in the area of offshore renewable energy, and will have an international orientation underpinned by the direct participation, as associate partners, of world-renowned research centres, small and medium-sized enterprises and large companies within the industry.

    REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL AND THE COURT OF AUDITORS Annual Management and Performance Report for the EU Budget - Financial Year 2021

  45. #2933022

    Gealltanas an rialtais teicneolaíochtaí foinsí in-athnuaite fuinnimh amach ón gcósta a ghlacadh amach anseo chomh maith lena sciar neamhcheangailteach de spriocanna an Aontais maidir le fuinneamh in-athnuaite amach ón gcósta a léiriú, is aistriú dearfach beartais é sin, ach tá tionscadail nithiúla fós le sainaithint.

    The government's commitment to adopt offshore renewable energy technologies in future and to indicate its non-binding share to the Union’s offshore renewable targets is a positive policy shift, but concrete projects have yet to be identified.

    Council Recommendation of 14 July 2023 on the 2023 National Reform Programme of Malta and delivering a Council opinion on the 2023 Stability Programme of Malta

  46. #2936678

    Gan dochar don sláine soláthair, don chomhtháthú margaidh agus don réamhinfheistíocht in eangacha amach ón gcósta is gá chun fuinneamh in-athnuaite amach ón gcósta a chur in úsáid, ba cheart do na húdaráis rialála náisiúnta fuinnimh a áirithiú go gcuirfear bunphrionsabal na héifeachtúlachta fuinnimh i bhfeidhm ar na próisis phleanála agus cinnteoireachta agus go ndreasófar leis na taraifí agus rialacháin gréasáin feabhsúcháin san éifeachtúlacht fuinnimh.

    Without prejudice to security of supply, market integration and anticipatory investments in offshore grids necessary for the deployment of offshore renewable energy, national energy regulatory authorities should ensure that the energy efficiency first principle is applied in the planning and decision-making processes and that network tariffs and regulations incentivise improvements in energy efficiency.

    Directive (EU) 2023/1791 of the European Parliament and of the Council of 13 September 2023 on energy efficiency and amending Regulation (EU) 2023/955 (recast) (Text with EEA relevance)

  47. #2941054

    Beidh sainaithint na dtionscadal comhpháirteach fuinnimh in-athnuaite amach ón gcósta comhsheasmhach leis na riachtanais arna sainaithint sna pleananna comhtháite straitéiseacha ardleibhéil maidir le forbairt gréasáin amach ón gcósta le haghaidh gach imchuach farraige dá dtagraítear in Airteagal 14(2) de Rialachán (AE) 2022/869 ó Pharlaimint na hEorpa agus ón gComhairle agus an plean forbartha gréasáin 10 mbliana uile-Aontais dá dtagraítear in Airteagal 30(1), pointe (b), de Rialachán (AE) 2019/943, ach féadfaidh siad dul thar na riachtanais sin agus féadfaidh siad rannpháirt sa tsainaithint sin a thabhairt d’údaráis áitiúla agus réigiúnacha agus do ghnóthais phríobháideacha.

    The identification of joint offshore renewable energy projects shall be consistent with the needs identified in the high-level strategic integrated offshore network development plans for each sea-basin referred to in Article 14(2) of Regulation (EU) 2022/869 of the European Parliament and of the Council and the Union-wide ten-year network development plan referred to in Article 30(1), point (b), of Regulation (EU) 2019/943, but may go beyond those needs and may involve local and regional authorities and private undertakings.

    Directive (EU) 2023/2413 of the European Parliament and of the Council of 18 October 2023 amending Directive (EU) 2018/2001, Regulation (EU) 2018/1999 and Directive 98/70/EC as regards the promotion of energy from renewable sources, and repealing Council Directive (EU) 2015/652

  48. #2941061

    Chun deonú ceadanna a éascú do thionscadail chomhpháirteacha fuinnimh in-athnuaite amach ón gcósta, laghdóidh na Ballstáit castacht an nós imeachta um dheonú ceadanna, méadóidh siad éifeachtúlacht agus trédhearcacht an nós imeachta sin, feabhsóidh siad an comhar eatarthu féin agus bunóidh siad, i gcás inarb iomchuí, pointe teagmhála aonair.

    In order to facilitate permit-granting for joint offshore renewable energy projects, Member States shall reduce the complexity and increase the efficiency and transparency of the permit-granting procedure, shall enhance cooperation among themselves and shall, where appropriate, establish a single contact point.

    Directive (EU) 2023/2413 of the European Parliament and of the Council of 18 October 2023 amending Directive (EU) 2018/2001, Regulation (EU) 2018/1999 and Directive 98/70/EC as regards the promotion of energy from renewable sources, and repealing Council Directive (EU) 2015/652

  49. #2941944

    I dteachtaireacht uaidh an 19 Samhain 2020, dar teideal An EU Strategy to harness the potential of offshore renewable energy for a climate neutral future [Straitéis AE chun leas a bhaint as acmhainneacht an fhuinnimh in-athnuaite amach ón gcósta do thodhchaí a bheidh aeráidneodrach], thug an Coimisiún isteach cuspóir uaillmhianach go mbainfí amach, faoi 2050, 300 GW d’fhuinneamh gaoithe amach ón gcósta agus 40 GW d’fhuinneamh aigéin thar imchuacha farraige uile an Aontais.

    In its Communication of 19 November 2020, entitled ‘An EU Strategy to harness the potential of offshore renewable energy for a climate neutral future’, the Commission introduced an ambitious objective of 300 GW of offshore wind and 40 GW of ocean energy across all the Union’s sea basins by 2050.

    Directive (EU) 2023/2413 of the European Parliament and of the Council of 18 October 2023 amending Directive (EU) 2018/2001, Regulation (EU) 2018/1999 and Directive 98/70/EC as regards the promotion of energy from renewable sources, and repealing Council Directive (EU) 2015/652

  50. #2941946

    Le Rialachán (AE) 2022/869 ó Pharlaimint na hEorpa agus ón gComhairle, ceanglaítear ar na Ballstáit comhaontuithe neamhcheangailteacha a thabhairt i gcrích chun comhoibriú maidir le spriocanna do ghiniúint fuinnimh in-athnuaite amach ón gcósta atá le himscaradh laistigh de gach imchuach farraige faoi 2050, le céimeanna idirmheánacha in 2030 agus in 2040.

    Regulation (EU) 2022/869 of the European Parliament and of the Council requires the Member States to conclude non-binding agreements to cooperate on goals for offshore renewable energy generation to be deployed within each sea basin by 2050, with intermediate steps in 2030 and 2040.

    Directive (EU) 2023/2413 of the European Parliament and of the Council of 18 October 2023 amending Directive (EU) 2018/2001, Regulation (EU) 2018/1999 and Directive 98/70/EC as regards the promotion of energy from renewable sources, and repealing Council Directive (EU) 2015/652