Gaois

Search direction

Search mode

Filter results

Collections

128 results in 47 documents

  1. #669571

    feirmeacha cumhachta gaoithe ag a bhfuil acmhainn 20 MW nó níos mó,

    wind power farms with a capacity of 20 MW or more,

    Regulation (EU) No 256/2014 of the European Parliament and of the Council of 26 February 2014 concerning the notification to the Commission of investment projects in energy infrastructure within the European Union, replacing Council Regulation (EU, Euratom) No 617/2010 and repealing Council Regulation (EC) No 736/96

  2. #1647996

    cumhacht gaoithe

    wind power

    Order of Business (Dáil Éireann/Seanad Éireann)

  3. #1713559

    RIAIL NORMALÚCHÁIN DON CHUNTAS AR LEICTREACHAS ARNA GHINIÚINT Ó HIDREACHUMHACHT AGUS Ó CHUMHACHT GHAOITHE

    NORMALISATION RULE FOR ACCOUNTING FOR ELECTRICITY GENERATED FROM HYDROPOWER AND WIND POWER

    Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (Text with EEA relevance.)

  4. #2124730

    Féach https://www.cleanenergywire.org/factsheets/german-onshore-wind-power-output-business-and-perspectives

    See https://www.cleanenergywire.org/factsheets/german-onshore-wind-power-output-business-and-perspectives

    Commission Implementing Regulation (EU) 2021/1432 of 1 September 2021 imposing a definitive anti-dumping duty on imports of certain pre- and post-stressing wires and wire strands of non-alloy steel (PSC wires and strands) originating in the People’s Republic of China following an expiry review pursuant to Article 11(2) of the Regulation (EU) 2016/1036 of the European Parliament and of the Council

  5. #2171251

    Giniúint leictreachais ó chumhacht ghaoithe

    Electricity generation from wind power

    Commission Delegated Regulation (EU) 2021/2139 of 4 June 2021 supplementing Regulation (EU) 2020/852 of the European Parliament and of the Council by establishing the technical screening criteria for determining the conditions under which an economic activity qualifies as contributing substantially to climate change mitigation or climate change adaptation and for determining whether that economic activity causes no significant harm to any of the other environmental objectives (Text with EEA relevance)

  6. #2171709

    Saoráidí giniúna leictreachais a fhoirgniú nó a oibriú ina dtáirgtear leictreachas le cumhacht ghaoithe.

    Construction or operation of electricity generation facilities that produce electricity from wind power.

    Commission Delegated Regulation (EU) 2021/2139 of 4 June 2021 supplementing Regulation (EU) 2020/852 of the European Parliament and of the Council by establishing the technical screening criteria for determining the conditions under which an economic activity qualifies as contributing substantially to climate change mitigation or climate change adaptation and for determining whether that economic activity causes no significant harm to any of the other environmental objectives (Text with EEA relevance)

  7. #2171710

    Gineann an ghníomhaíocht leictreachas trí bhíthin cumhacht ghaoithe.

    The activity generates electricity from wind power.

    Commission Delegated Regulation (EU) 2021/2139 of 4 June 2021 supplementing Regulation (EU) 2020/852 of the European Parliament and of the Council by establishing the technical screening criteria for determining the conditions under which an economic activity qualifies as contributing substantially to climate change mitigation or climate change adaptation and for determining whether that economic activity causes no significant harm to any of the other environmental objectives (Text with EEA relevance)

  8. #2179570

    Beartaítear sa phlean “slabhra tionscail do threalamh cumhachta gaoithe a thógáil’.

    The plan envisages to “Build a wind power equipment industry chain”.

    Commission Implementing Regulation (EU) 2021/2239 of 15 December 2021 imposing a definitive anti-dumping duty on imports of certain utility scale steel wind towers originating in the People’s Republic of China

  9. #2180678

    Iomaíocht idir cumhacht ghaoithe agus foinsí fuinnimh eile

    Competition of wind power with other energy sources

    Commission Implementing Regulation (EU) 2021/2239 of 15 December 2021 imposing a definitive anti-dumping duty on imports of certain utility scale steel wind towers originating in the People’s Republic of China

  10. #2181171

    Lena chois sin, shuiteáil Meicsiceo in 2020 acmhainneacht cumhachta gaoithe nua de thuairim is 0,6 GW.

    In addition, in 2020, Mexico installed a new wind power capacity of approximately 0,6 GW.

    Commission Implementing Regulation (EU) 2021/2239 of 15 December 2021 imposing a definitive anti-dumping duty on imports of certain utility scale steel wind towers originating in the People’s Republic of China

  11. #2306996

    Dá bhrí sin, d’iarr LM Wind Power ar an gCoimisiún deireadh a chur leis an imscrúdú sin láithreach.

    Therefore, LM Wind Power requested that the Commission should terminate this investigation immediately.

    Commission Implementing Regulation (EU) 2022/301 of 24 February 2022 extending the definitive countervailing duty imposed by Implementing Regulation (EU) 2020/776 on imports of certain woven and/or stitched glass fibre fabrics (‘GFF’) originating in the People’s Republic of China (‘the PRC’) to imports of GFF consigned from Morocco, whether declared as originating in Morocco or not, and terminating the investigation concerning possible circumvention of the countervailing measures imposed by Implementing Regulation (EU) 2020/776 on imports of GFF originating in Egypt by imports of GFF consigned from Morocco, whether declared as originating in Morocco or not

  12. #2436623

    Dá ndéanfaí nósanna imeachta ceadaithe a chuíchóiriú tuilleadh, d’éascódh sé an t-ualach a bhaineann le fuinneamh inathnuaite a imscaradh, go háirithe cumhacht ghaoithe.

    Further streamlining permitting procedures would ease the burden of deploying renewable energy, in particular wind power.

    Council Recommendation of 12 July 2022 on the 2022 National Reform Programme of Sweden and delivering a Council opinion on the 2022 Convergence Programme of Sweden

  13. #2516724

    Tionóladh éisteacht an 4 Feabhra 2022 le LM Wind Power.

    A hearing was held on 4 February 2022 with LM Wind Power.

    Commission Implementing Regulation (EU) 2022/1477 of 6 September 2022 extending the definitive anti-dumping duty imposed by Implementing Regulation (EU) 2020/492, as amended by Implementing Regulation (EU) 2020/776, on imports of certain woven and/or stitched glass fibre fabrics originating in the People’s Republic of China and Egypt to imports of certain woven and/or stitched glass fibre fabrics consigned from Turkey, whether declared as originating in Turkey or not

  14. #2517087

    Tionóladh éisteacht an 4 Feabhra 2022 le LM Wind Power.

    A hearing was held on 4 February 2022 with LM Wind Power.

    Commission Implementing Regulation (EU) 2022/1478 of 6 September 2022 extending the definitive countervailing duty imposed by Implementing Regulation (EU) 2020/776, on imports of certain woven and/or stitched glass fibre fabrics originating in the People’s Republic of China and Egypt to imports of certain woven and/or stitched glass fibre fabrics consigned from Turkey, whether declared as originating in Turkey or not

  15. #448602

    “Suiteáil chun leas a bhaint as cumhacht na gaoithe chun fuinneamh a tháirgeadh (feirm ghaoithe) ag a bhfuil níos mó ná 25 thuirbín nó ag a bhfuil aschur iomlán is mó ná 50 meigeavata.”

    “An installation for the harnessing of wind power for energy production (a wind farm) with more than 25 turbines or having a total output greater than 50 megawatts.”

    PLANNING AND DEVELOPMENT (AMENDMENT) ACT 2010

  16. #448604

    “Suiteáil chun leas a bhaint as cumhacht na gaoithe chun fuinneamh a tháirgeadh (feirm ghaoithe) ag a bhfuil níos mó ná 50 tuirbín nó ag a bhfuil aschur iomlán is mó ná 100 meigeavata.”

    “An installation for the harnessing of wind power for energy production (a wind farm) with more than 50 turbines or having a total output greater than 100 megawatts.”,

    PLANNING AND DEVELOPMENT (AMENDMENT) ACT 2010

  17. #1712447

    Chun rannchuidiú hidreachumhachta agus cumhachta gaoithe a ríomh chun críocha na Treorach seo, ba cheart éifeachtaí éagsúlachtaí aeráide a rianú trí riail normalúcháin a úsáid.

    In calculating the contribution of hydropower and wind power for the purposes of this Directive, the effects of climatic variation should be smoothed through the use of a normalisation rule.

    Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (Text with EEA relevance.)

  18. #1712875

    Is i gcomhréir leis na rialacha normalúcháin arna socrú in Iarscríbhinn II a dhéanfar cuntas ar leictreachas arna ghiniúint le hidreachumhacht agus le cumhacht ghaoithe.

    The electricity generated by hydropower and wind power shall be accounted for in accordance with the normalisation rules set out in Annex II.

    Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (Text with EEA relevance.)

  19. #1713566

    Cuirfear an riail seo a leanas i bhfeidhm chun críocha cuntasaíochta don leictreachas arna ghiniúint ó chumhacht ghaoithe ar talamh i mBallstát tugtha:

    The following rule shall be applied for the purposes of accounting for electricity generated from onshore wind power in a given Member State:

    Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (Text with EEA relevance.)

  20. #1713568

    an leictreachas normalaithe arna ghiniúint ag gach gléasra cumhachta gaoithe ar talamh den Bhallstát sa bhliain N, chun críocha cuntasaíochta;

    normalised electricity generated by all onshore wind power plants of the Member State in year N, for accounting purposes;

    Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (Text with EEA relevance.)

  21. #1713569

    cainníocht an leictreachais arna ghiniúint go hiarbhír i mbliain i ag gach stáisiún hidrileictreach ar talamh sa Bhallstát arna thomhas in GWh;

    the quantity of electricity actually generated in year i by all onshore wind power plants of the Member State measured in GWh;

    Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (Text with EEA relevance.)

  22. #1713570

    an toilleadh iomlán suiteáilte atá ag gach gléasra cumhachta gaoithe ar talamh sa Bhallstát ag deireadh na bliana j, arna thomhas in MW;

    the total installed capacity of all the onshore wind power plants of the Member State at the end of year j, measured in MW;

    Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (Text with EEA relevance.)

  23. #1713572

    Cuirfear an riail seo a leanas i bhfeidhm chun críocha cuntasaíochta don leictreachas arna ghiniúint ó chumhacht ghaoithe amach ón gcósta i mBallstát tugtha:

    The following rule shall be applied for the purposes of accounting for electricity generated from offshore wind power in a given Member State:

    Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (Text with EEA relevance.)

  24. #1713573

    an leictreachas normalaithe arna ghiniúint ag gach gléasra cumhachta gaoithe amach ón gcósta den Bhallstát sa bhliain N, chun críocha cuntasaíochta;

    normalised electricity generated by all offshore wind power plants of the Member State in year N, for accounting purposes;

    Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (Text with EEA relevance.)

  25. #1713574

    cainníocht an leictreachais arna ghiniúint go hiarbhír i mbliain i ag gach stáisiún hidrileictreach amach ón gcósta sa Bhallstát arna thomhas in GWh;

    the quantity of electricity actually generated in year i by all offshore wind power plants of the Member State measured in GWh;

    Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (Text with EEA relevance.)

  26. #1713575

    an toilleadh iomlán suiteáilte atá ag gach gléasra cumhachta gaoithe amach ón gcósta sa Bhallstát ag deireadh na bliana j, arna thomhas in MW;

    the total installed capacity of all the offshore wind power plants of the Member State at the end of year j, measured in MW;

    Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources (Text with EEA relevance.)

  27. #2179556

    Thairis sin, rinneadh amach go raibh gníomhaíochtaí forbartha páirtí ar bun sna táirgeoirí onnmhairiúcháin sampláilte Penglai Dajin agus Shanghai Taisheng Wind Power Equipment.

    Furthermore, party building activities were found in the sampled exporting producer Penglai Dajin and Shanghai Taisheng Wind Power Equipment.

    Commission Implementing Regulation (EU) 2021/2239 of 15 December 2021 imposing a definitive anti-dumping duty on imports of certain utility scale steel wind towers originating in the People’s Republic of China

  28. #2179993

    Chonacthas feidhmíocht cosúil leis sin in 2018 (0,7 GW d’acmhainneacht bhreise cumhachta gaoithe), bliain nach ndeachaigh neamhchinnteacht mar thoradh ar an athrú i mbeartais rialtasacha i bhfeidhm uirthi.

    It was a performance similar to 2018 (0,7 GW of additional wind power capacity), a year that was not affected by uncertainty resulting from the change in governmental policies.

    Commission Implementing Regulation (EU) 2021/2239 of 15 December 2021 imposing a definitive anti-dumping duty on imports of certain utility scale steel wind towers originating in the People’s Republic of China

  29. #2180215

    Maidir le Speco Wind Power, S.A. de C.V., d’úsáid an Coimisiún an fhaisnéis airgeadais aonair le haghaidh 2019 mar atá ar fáil in Global Financials le D&B.

    With regard to Speco Wind Power, S.A. de C.V., the Commission used the individual financial information for 2019 as available in Global Financials by D&B.

    Commission Implementing Regulation (EU) 2021/2239 of 15 December 2021 imposing a definitive anti-dumping duty on imports of certain utility scale steel wind towers originating in the People’s Republic of China

  30. #2181056

    Cuir i gcomparáid le https://gwec.net/north-and-latin-america-increased-wind-power-installations-by-62-in-2020/ (an dáta deireanach ar breathnaíodh air an 1 Meitheamh 2021).

    Compare to https://gwec.net/north-and-latin-america-increased-wind-power-installations-by-62-in-2020/ (last viewed 1 June 2021).

    Commission Implementing Regulation (EU) 2021/2239 of 15 December 2021 imposing a definitive anti-dumping duty on imports of certain utility scale steel wind towers originating in the People’s Republic of China

  31. #2181169

    Chuig sin, bhain suiteálacha cumhachta gaoithe Mheicsiceo leibhéal níos airde ná riamh de 1,6 GW d’acmhainneacht bhreise in 2019.

    In this respect, Mexico’s new wind power installations achieved a record high with 1,6 GW of additional capacity in 2019.

    Commission Implementing Regulation (EU) 2021/2239 of 15 December 2021 imposing a definitive anti-dumping duty on imports of certain utility scale steel wind towers originating in the People’s Republic of China

  32. #2254014

    Thairis sin, déantar saintréithe solúbthachta na cumhachta gaoithe ón talamh a scagadh agus áirítear teicneolaíochtaí de chineál cumhachta a thiontú go x mar theicneolaíochtaí nua.

    Furthermore, the flexibility characteristics of offshore wind power are refined, and power-to-x technologies are included as new technologies.

    Commission Decision (EU) 2022/639 of 27 August 2021 on the aid scheme SA.54915 – 2020/C (ex 2019/N) Belgium – Capacity remuneration mechanism (notified under document C(2021) 6431) (Only the English version is authentic) (Text with EEA relevance)

  33. #2306993

    Luaigh LM Wind Power go háirithe go raibh líomhaintí áirithe ann san iarraidh dá dtagraítear in aithris (2) maidir le hoibríochtaí cóimeála agus le trasloingsithe, agus gur ar an mbonn sin a thionscain an Coimisiún an t-imscrúdú.

    LM Wind Power noted in particular that the request as referred to in recital (2) contained in particular allegations regarding assembly operations and transhipments, on which basis the Commission initiated the investigation.

    Commission Implementing Regulation (EU) 2022/301 of 24 February 2022 extending the definitive countervailing duty imposed by Implementing Regulation (EU) 2020/776 on imports of certain woven and/or stitched glass fibre fabrics (‘GFF’) originating in the People’s Republic of China (‘the PRC’) to imports of GFF consigned from Morocco, whether declared as originating in Morocco or not, and terminating the investigation concerning possible circumvention of the countervailing measures imposed by Implementing Regulation (EU) 2020/776 on imports of GFF originating in Egypt by imports of GFF consigned from Morocco, whether declared as originating in Morocco or not

  34. #2306999

    D’áitigh siad freisin, cosúil leis na maímh ó LM Wind Power, go raibh easpa fianaise chun imchéimniú a chruthú in aon cheann de na foirmeacha seo a leanas:

    They also argued, similar to the claims of LM Wind Power, that there was a lack of evidence to prove circumvention in a form of either:

    Commission Implementing Regulation (EU) 2022/301 of 24 February 2022 extending the definitive countervailing duty imposed by Implementing Regulation (EU) 2020/776 on imports of certain woven and/or stitched glass fibre fabrics (‘GFF’) originating in the People’s Republic of China (‘the PRC’) to imports of GFF consigned from Morocco, whether declared as originating in Morocco or not, and terminating the investigation concerning possible circumvention of the countervailing measures imposed by Implementing Regulation (EU) 2020/776 on imports of GFF originating in Egypt by imports of GFF consigned from Morocco, whether declared as originating in Morocco or not

  35. #2307130

    Tar éis an nochta, mhaígh Grúpa PGTEX agus LM Wind Power nach raibh aon athrú ar an ngréasán trádála.

    Following disclosure, the PGTEX Group as well as LM Wind Power claimed that there was no change in the pattern of trade.

    Commission Implementing Regulation (EU) 2022/301 of 24 February 2022 extending the definitive countervailing duty imposed by Implementing Regulation (EU) 2020/776 on imports of certain woven and/or stitched glass fibre fabrics (‘GFF’) originating in the People’s Republic of China (‘the PRC’) to imports of GFF consigned from Morocco, whether declared as originating in Morocco or not, and terminating the investigation concerning possible circumvention of the countervailing measures imposed by Implementing Regulation (EU) 2020/776 on imports of GFF originating in Egypt by imports of GFF consigned from Morocco, whether declared as originating in Morocco or not

  36. #2307160

    Ina theannta sin, níor thacaigh an fhianaise le hargóint LM Wind Power gur bunaíodh PGTEX Morocco SARL chun freastal ar mhargaí Mharacó agus an Mheánoirthir.

    In addition, the argument of LM Wind Power that PGTEX Morocco SARL was set up to serve Moroccan and Middle Eastern markets was not supported by the evidence.

    Commission Implementing Regulation (EU) 2022/301 of 24 February 2022 extending the definitive countervailing duty imposed by Implementing Regulation (EU) 2020/776 on imports of certain woven and/or stitched glass fibre fabrics (‘GFF’) originating in the People’s Republic of China (‘the PRC’) to imports of GFF consigned from Morocco, whether declared as originating in Morocco or not, and terminating the investigation concerning possible circumvention of the countervailing measures imposed by Implementing Regulation (EU) 2020/776 on imports of GFF originating in Egypt by imports of GFF consigned from Morocco, whether declared as originating in Morocco or not

  37. #2307539

    Tar éis an nochta, mhaígh Grúpa PGTEX agus LM Wind Power nach raibh aon athrú ar an ngréasán trádála.

    Following disclosure, the PGTEX Group as well as LM Wind Power claimed that there was no change in the pattern of trade.

    Commission Implementing Regulation (EU) 2022/302 of 24 February 2022 extending the definitive anti-dumping duty imposed by Implementing Regulation (EU) 2020/492, as amended by Implementing Regulation (EU) 2020/776, on imports of certain woven and/or stitched glass fibre fabrics (‘GFF’) originating in the People’s Republic of China (‘the PRC’) to imports of GFF consigned from Morocco, whether declared as originating in Morocco or not, and terminating the investigation concerning possible circumvention of the anti-dumping measures imposed by Implementing Regulation (EU) 2020/492 on imports of GFF originating in Egypt by imports of GFF consigned from Morocco, whether declared as originating in Morocco or not

  38. #2307570

    Ina theannta sin, níor thacaigh an fhianaise le hargóint LM Wind Power gur bunaíodh PGTEX Morocco SARL chun freastal ar mhargaí Mharacó agus an Mheánoirthir.

    In addition, the argument of LM Wind Power that PGTEX Morocco was set up to serve Moroccan and Middle Eastern markets was not supported by the evidence.

    Commission Implementing Regulation (EU) 2022/302 of 24 February 2022 extending the definitive anti-dumping duty imposed by Implementing Regulation (EU) 2020/492, as amended by Implementing Regulation (EU) 2020/776, on imports of certain woven and/or stitched glass fibre fabrics (‘GFF’) originating in the People’s Republic of China (‘the PRC’) to imports of GFF consigned from Morocco, whether declared as originating in Morocco or not, and terminating the investigation concerning possible circumvention of the anti-dumping measures imposed by Implementing Regulation (EU) 2020/492 on imports of GFF originating in Egypt by imports of GFF consigned from Morocco, whether declared as originating in Morocco or not

  39. #2347046

    Mol amháin nó níos mó sa Mhuir Thuaidh ag a bhfuil idirnascairí le tíortha i dteorainn leis an Muir Thuaidh (an Danmhairg, an Ghearmáin, an Ísiltír) [ar a dtugtar “North Sea Wind Power Hub” faoi láthair]

    One or more hubs in the North Sea with interconnectors to bordering North Sea countries (Denmark, Germany, Netherlands) [currently known as “North Sea Wind Power Hub”]

    Commission Delegated Regulation (EU) 2022/564 of 19 November 2021 amending Regulation (EU) No 347/2013 of the European Parliament and of the Council as regards the Union list of projects of common interest

  40. #2365950

    Tacóidh plean na Liotuáine le gnólachtaí príobháideacha, feirmeoirí agus comhphobail fuinnimh in-athnuaite, gléasraí grianchumhachta agus gléasraí cumhachta gaoithe ar talamh a fháil agus a shuiteáil, mar aon le fearais stórála.

    Lithuania’s plan will support private businesses, farmers and renewable energy communities for the acquisition and installation of onshore solar and wind power plants, together with storage installations.

    REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the implementation of the Recovery and Resilience Facility

  41. #2434236

    Tacú le bardais chun pleananna áitiúla mionsonraithe a fhorbairt chun fuinneamh in-athnuaite a imscaradh, lena n-áirítear cumhacht na gaoithe agus fótavoltach, agus le haghaidh córais téimh agus fuaraithe ceantair.

    Support municipalities in developing detailed local plans for the deployment of renewable energy, including wind power and photovoltaics, and for district heating and cooling systems.

    Council Recommendation of 12 July 2022 on the 2022 National Reform Programme of Luxembourg and delivering a Council opinion on the 2022 Stability Programme of Luxembourg

  42. #2928659

    Is féidir céimeanna breise a ghlacadh chun dlús a chur le húsáid na cumhachta gaoithe ar tír agus le treisiú na heangaí a bhaineann leis sin.

    Further steps can be taken to accelerate the deployment of onshore wind power and related grid reinforcement.

    Council Recommendation of 14 July 2023 on the 2023 National Reform Programme of Belgium and delivering a Council opinion on the 2023 Stability Programme of Belgium

  43. #2932504

    Tacú le bardais chun pleananna áitiúla mionsonraithe a fhorbairt chun fuinneamh in-athnuaite a imscaradh, lena n-áirítear cumhacht na gaoithe agus fótavoltach, agus le haghaidh córais téimh agus fuaraithe ceantair.

    Support municipalities in developing detailed local plans for deploying renewable energy, including wind power and photovoltaics, and for district heating and cooling systems.

    Council Recommendation of 14 July 2023 on the 2023 National Reform Programme of Luxembourg and delivering a Council opinion on the 2023 Stability Programme of Luxembourg

  44. #2932787

    Tá stop curtha le suiteáil gléasraí cumhachta gaoithe agus táthar ag súil go gcuirfear tús leis arís tar éis deireadh a chur le srianta dlíthiúla.

    The installation of wind power plants has been suspended and is expected to resume after the removal of legal restrictions.

    Council Recommendation of 14 July 2023 on the 2023 National Reform Programme of Hungary and delivering a Council opinion on the 2023 Convergence Programme of Hungary

  45. #3180866

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final

    Communication on European Wind Power Action Plan COM (2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM (2023) 668 final.

    Commission Recommendation (EU) 2024/596 of 18 December 2023 on the draft updated integrated national energy and climate plan of Denmark covering the period 2021-2030 and on the consistency of Denmark’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  46. #3181014

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final

    Communication on European Wind Power Action Plan COM(2023) 669 final, 24.10.2023, and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final.

    Commission Recommendation (EU) 2024/597 of 18 December 2023 on the draft updated integrated national energy and climate plan of Portugal covering the period 2021–2030 and on the consistency of Portugal’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  47. #3181193

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final.

    Communication on European Wind Power Action Plan COM (2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM (2023) 668 final.

    Commission Recommendation (EU) 2024/598 of 18 December 2023 on the draft updated integrated national energy and climate plan of Romania covering the period 2021-2030 and on the consistency of Romania’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  48. #3181361

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final

    Communication on European Wind Power Action Plan COM(2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final.

    Commission Recommendation (EU) 2024/599 of 18 December 2023 on the draft updated integrated national energy and climate plan of Italy covering the period 2021-2030 and on the consistency of Italy’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  49. #3181494

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final.

    Communication on European Wind Power Action Plan COM(2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final.

    Commission Recommendation (EU) 2024/600 of 18 December 2023 on the draft updated integrated national energy and climate plan of Spain covering the period 2021-2030 and on the consistency of Spain’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation

  50. #3181674

    Teachtaireacht maidir leis an bPlean Gníomhaíochta Eorpach um Chumhacht Ghaoithe COM (2023) 669 final, 24.10.2023 agus Teachtaireacht maidir le huaillmhian an Aontais a bhaint amach maidir le fuinneamh in-athnuaite amach ón gcósta, COM (2023) 668 final.

    Communication on European Wind Power Action Plan COM(2023) 669 final, 24.10.2023 and Communication on delivering EU offshore renewable energy ambition, COM(2023) 668 final.

    Commission Recommendation (EU) 2024/603 of 18 December 2023 on the draft updated integrated national energy and climate plan of Czechia covering the period 2021-2030 and on the consistency of Czechia’s measures with the Union’s climate-neutrality objective and with ensuring progress on adaptation