Gaois

Search direction

Search mode

Filter results

Collections

164 results in 43 documents

  1. #2941220

    Nuair a cheanglaítear aon mheasúnú den sórt sin a dhéanamh ar an tionchar ar an gcomhshaol, agus an fhaisnéis a sholáthair an forbróir tionscadail á cur san áireamh, eiseoidh an t-údarás inniúil tuairim maidir le raon feidhme agus leibhéal mionsonraí na faisnéise atá le háireamh ag an bhforbróir tionscadail sa tuarascáil measúnaithe ar an tionchar ar an gcomhshaol, agus ní dhéanfar a raon feidhme a leathnú ina dhiaidh sin.

    When any such environmental impact assessment is required, the competent authority, taking into account the information provided by the project developer, shall issue an opinion on the scope and level of detail of the information to be included by the project developer in the environmental impact assessment report, of which the scope shall not be extended subsequently.

    Directive (EU) 2023/2413 of the European Parliament and of the Council of 18 October 2023 amending Directive (EU) 2018/2001, Regulation (EU) 2018/1999 and Directive 98/70/EC as regards the promotion of energy from renewable sources, and repealing Council Directive (EU) 2015/652

  2. #2941229

    I gcás nach bhfuil úsáid spáis bhreise i gceist le hathchumhachtú suiteálacha gréine agus ina gcomhlíonann sé na bearta maolaithe comhshaoil is infheidhme arna leagan síos le haghaidh na suiteála gréine bunaidh, beidh an tionscadal díolmhaithe ó aon cheanglais is infheidhme próiseas scagtha dá bhforáiltear in Airteagal 16a(4) a dhéanamh, cinneadh a dhéanamh i dtaobh an bhfuil measúnú ar an tionchar ar an gcomhshaol ag teastáil ón tionscadal, nó measúnú ar an tionchar ar an gcomhshaol a dhéanamh de bhun Airteagal 4 de Threoir 2011/92/AE.

    Where the repowering of solar installations does not entail the use of additional space and complies with the applicable environmental mitigation measures established for the original solar installation, the project shall be exempt from any applicable requirements to carry out a screening process as provided for in Article 16a(4), to determine whether the project requires an environmental impact assessment, or to carry out an environmental impact assessment pursuant to Article 4 of Directive 2011/92/EU.

    Directive (EU) 2023/2413 of the European Parliament and of the Council of 18 October 2023 amending Directive (EU) 2018/2001, Regulation (EU) 2018/1999 and Directive 98/70/EC as regards the promotion of energy from renewable sources, and repealing Council Directive (EU) 2015/652

  3. #3064956

    áiritheoidh sé go mbeidh deis luath agus éifeachtach agus tréimhse ama iomchuí ag gach duine leasmhar, lena n-áirítear eagraíochtaí neamhrialtasacha, chun a bheith rannpháirteach sa mheasúnú tionchair ar an gcomhshaol chomh maith le tréimhse ama iomchuí chun barúlacha a sholáthar maidir leis an tuarascáil ar an measúnú ar an tionchar ar an gcomhshaol;

    ensure that all interested persons, including non-governmental organisations, have an early and effective opportunity, and an appropriate time period, to participate in the environmental impact assessment as well as an appropriate time period to provide comments on the environmental impact assessment report;

    22024A0022

  4. #311225

    (15) Ba cheart infheistíochtaí i mbonneagar nua gáis a chur chun cinn go mór agus níor cheart na hinfheistíochtaí sin a dhéanamh ach amháin tar éis measúnú iomchuí ar an tionchar ar an gcomhshaol a dhéanamh, i gcomhréir le gníomhartha ábhartha dlí an Aontais.

    (15) Investments in new gas infrastructure should be strongly promoted and should be effected only after an appropriate environmental impact assessment, in accordance with the relevant legal acts of the Union.

    Regulation (EU) No 994/2010 of the European Parliament and of the Council of 20 October 2010 concerning measures to safeguard security of gas supply and repealing Council Directive 2004/67/EC

  5. #446875

    Treoir 91/271/CEE an 21 Bealtaine 1991 ón gComhairle maidir le cóireáil dramh-uisce uirbigh

    Environmental Impact Assessment Directive Council Directive 91/271/EEC of 21 May 19913 concerning urban waste-water treatment

    PLANNING AND DEVELOPMENT (AMENDMENT) ACT 2010

  6. #447744

    (a) an dtiocfaí timpeall ar chríoch agus ar chuspóirí na Treorach um Measúnacht Tionchair Timpeallacha nó na Treorach um Ghnáthóga tríd an bhforbairt a thabhairt chun rialtachta;

    (a) whether regularisation of the development concerned would circumvent the purpose and objectives of the Environmental Impact Assessment Directive or the Habitats Directive;

    PLANNING AND DEVELOPMENT (AMENDMENT) ACT 2010

  7. #479423

    ciallaíonn "Coinbhinsiún Trasteorann" Coinbhinsiún Choimisiún Eacnamaíochta na Náisiún Aontaithe don Eoraip maidir le Measúnacht Tionchair Timpeallachta i gComhthéacs Trasteorann, arna dhéanamh in Espoo (An Fhionlainn) an 25 Feabhra, 1991;

    "Transboundary Convention" means the United Nations Economic Commission for Europe Convention on Environmental Impact Assessment in a Transboundary Context, done at Espoo (Finland), on 25 February, 1991;

    PLANNING AND DEVELOPMENT ACT, 2000

  8. #481344

    (3) Maidir le haon tagairt in achtachán d’fhorbairt d’aicme a shonraítear faoi Airteagal 24 de Rialacháin na gComhphobal Eorpach (Measúnacht Tionchair Timpeallachta), 1989 (I.R.

    (3) Any reference in an enactment to development of a class specified under Article 24 of the European Communities (Environmental Impact Assessment) Regulations, 1989 (S.I.

    PLANNING AND DEVELOPMENT ACT, 2000

  9. #488944

    Leasú ar alt 13A (measúnacht tionchair timpeallachta ar thograí áirithe a bhaineann leis an imeall trá) d’Acht 1933.

    Amendment of section 13A (environmental impact assessment of certain proposals relating to the foreshore) of Act of 1933.

    FORESHORE AND DUMPING AT SEA (AMENDMENT) ACT 2009

  10. #565223

    ciallaíonn “Measúnacht Tionchair Timpeallachta” measúnacht a dhéanfar de réir fhorálacha aon achtacháin nó Rialachán arna dhéanamh nó arna ndéanamh i dtaca leis an Treoir MTT;

    Environmental Impact Assessment” means an assessment carried out in accordance with the provisions of any enactment or Regulations made in connection with the EIA Directive;

    European Communities (Birds and Natural Habitats) Regulations 2011

  11. #660487

    Ba cheart an anailís ar an gcostas agus ar na sochair a bheidh ann don aeráid agus don chomhshaol a bheith bunaithe ar an measúnú ar an tionchar ar an gcomhshaol a chuirtear i gcrích de bhun Threoir 2011/92/AE;

    The analysis of climate-related and environmental costs and benefits shall be based on the environmental impact assessment carried out pursuant to Directive 2011/92/EU;

    Regulation (EU) No 1315/2013 of the European Parliament and of the Council of 11 December 2013 on Union guidelines for the development of the trans-European transport network and repealing Decision No 661/2010/EU Text with EEA relevance

  12. #670985

    measúnú ar an tionchar ar an gcomhshaol dá dtagraítear i dTreoir 2001/42/CE ó Pharlaimint na hEorpa agus ón gComhairle [31] agus i dTreoir 92/43/CEE;

    environmental impact assessment as referred to in Directive 2001/42/EC of the European Parliament and of the Council [31] and Directive 92/43/EEC;

    Regulation (EU) No 508/2014 of the European Parliament and of the Council of 15 May 2014 on the European Maritime and Fisheries Fund and repealing Council Regulations (EC) No 2328/2003, (EC) No 861/2006, (EC) No 1198/2006 and (EC) No 791/2007 and Regulation (EU) No 1255/2011 of the European Parliament and of the Council

  13. #1606949

    Measúnacht Tionchair Timpeallachta (MTT). Treoraíocht d’Údaráis Toilíochta maidir le Forbairt Fo-thairseach. (Lúnasa, 2003).

    ENVIRONMENTAL IMPACT ASSESSMENT (EIA). GUIDANCE FOR CONSENT AUTHORITIES REGARDING SUB-THRESHOLD DEVELOPMENT. (AUGUST, 2003).

    Order of Business (Dáil Éireann/Seanad Éireann)

  14. #1607672

    Rialacháin na gComhphobal Eorpach (Measúnacht Tionchair Timpeallachta) (Leasú) 2006 (I.R. Uimh. 659 de 2006).

    EUROPEAN COMMUNITIES (ENVIRONMENTAL IMPACT ASSESSMENT) (AMENDMENT) REGULATIONS 2006 (S.I. NO. 659 OF 2006).

    Order of Business (Dáil Éireann/Seanad Éireann)

  15. #1607673

    Rialacháin na gComhphobal Eorpach (Measúnacht Tionchair Timpeallachta) (Leasú), 1999 (I.R. Uimh. 93 de 1999).

    EUROPEAN COMMUNITIES (ENVIRONMENTAL IMPACT ASSESSMENT) (AMENDMENT) REGULATIONS, 1999 (S.I. NO. 93 OF 1999).

    Order of Business (Dáil Éireann/Seanad Éireann)

  16. #1607674

    Rialacháin na gComhphobal Eorpach (Measúnacht Tionchair Timpeallachta) (Leasú), 2001 (I.R. Uimh. 538 de 2001).

    EUROPEAN COMMUNITIES (ENVIRONMENTAL IMPACT ASSESSMENT) (AMENDMENT) REGULATIONS, 2001 (S.I. NO. 538 OF 2001).

    Order of Business (Dáil Éireann/Seanad Éireann)

  17. #1607675

    Rialacháin na gComhphobal Eorpach (Measúnacht Tionchair Timpeallachta) (Córas Toilíochta Foraoiseachta) (Leasú) 2006 (I.R. Uimh. 168 de 2006).

    EUROPEAN COMMUNITIES (ENVIRONMENTAL IMPACT ASSESSMENT) (FORESTRY CONSENT SYSTEM) (AMENDMENT) REGULATIONS 2006 (S.I. NO. 168 OF 2006).

    Order of Business (Dáil Éireann/Seanad Éireann)

  18. #1609149

    Rialacháin an Aontais Eorpaigh (Measúnacht Tionchair Timpeallachta agus Gnáthóga) (Uimh. 2), 2015 (I.R. Uimh. 320 de 2015).

    EUROPEAN UNION (ENVIRONMENTAL IMPACT ASSESSMENT AND HABITATS) (NO. 2) REGULATIONS 2015 (S.I. NO. 320 OF 2015).

    Order of Business (Dáil Éireann/Seanad Éireann)

  19. #1609150

    Rialacháin an Aontais Eorpaigh (Measúnacht Tionchair Timpeallachta agus Gnáthóga), 2015. (I.R. Uimh. 301 de 2015).

    EUROPEAN UNION (ENVIRONMENTAL IMPACT ASSESSMENT AND HABITATS) REGULATIONS 2015. (S.I. NO. 301 OF 2015).

    Order of Business (Dáil Éireann/Seanad Éireann)

  20. #1646705

    Na Rialacháin um Scardadh Dramhuisce (Údarú) (Measúnacht Tionchair Timpeallachta), 2016 (I.R. Uimh. 652 de 2016).

    WASTE WATER DISCHARGE (AUTHORISATION) (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2016 (S.I. NO. 652 OF 2016).

    Order of Business (Dáil Éireann/Seanad Éireann)

  21. #2171336

    Cuimsítear sa phlean foraoisithe gach gné a éilítear sa dlí náisiúnta a bhaineann le measúnú ar an tionchar ar an gcomhshaol den fhoraoisiú.

    The afforestation plan contains all elements required by the national law relating to environmental impact assessment of afforestation.

    Commission Delegated Regulation (EU) 2021/2139 of 4 June 2021 supplementing Regulation (EU) 2020/852 of the European Parliament and of the Council by establishing the technical screening criteria for determining the conditions under which an economic activity qualifies as contributing substantially to climate change mitigation or climate change adaptation and for determining whether that economic activity causes no significant harm to any of the other environmental objectives (Text with EEA relevance)

  22. #2172599

    Cuireadh Measúnú ar an Tionchar ar an gComhshaol (MTC) nó scagadh i gcrích i gcomhréir le Treoir 2011/92/AE.

    An Environmental Impact Assessment (EIA) or screening has been completed in accordance with Directive 2011/92/EU.

    Commission Delegated Regulation (EU) 2021/2139 of 4 June 2021 supplementing Regulation (EU) 2020/852 of the European Parliament and of the Council by establishing the technical screening criteria for determining the conditions under which an economic activity qualifies as contributing substantially to climate change mitigation or climate change adaptation and for determining whether that economic activity causes no significant harm to any of the other environmental objectives (Text with EEA relevance)

  23. #2266668

    Ba cheart do na Ballstáit sprioc-amanna ceangailteacha a bhunú maidir le gach céim ábhartha den nós imeachta um mheasúnú tionchair ar an gcomhshaol.

    Member States should establish binding maximum deadlines for all relevant stages of the environmental impact assessment procedure.

    Commission Recommendation (EU) 2022/822 of 18 May 2022 on speeding up permit-granting procedures for renewable energy projects and facilitating Power Purchase Agreements

  24. #2266698

    Ba cheart do na Ballstáit úsáid a bhaint as scóipiú ar bhealach córasach nó é a dhéanamh sainordaitheach chun feabhas a chur ar cháilíocht an phróisis measúnaithe tionchair ar an gcomhshaol.

    Member States should use scoping in a systematic manner or make it mandatory in order to improve the quality of the environmental impact assessment process.

    Commission Recommendation (EU) 2022/822 of 18 May 2022 on speeding up permit-granting procedures for renewable energy projects and facilitating Power Purchase Agreements

  25. #2266731

    Ciallaíonn scóipiú tuairim a thabhairt maidir le raon feidhme agus leibhéal sonraí na faisnéise comhshaoil a bheidh le cur isteach i bhfoirm tuarascáil mheasúnaithe tionchair ar an gcomhshaol.

    Scoping means issuing an opinion on the scope and level of detail of the environmental information to be submitted in the form of an environmental impact assessment report.

    Commission Recommendation (EU) 2022/822 of 18 May 2022 on speeding up permit-granting procedures for renewable energy projects and facilitating Power Purchase Agreements

  26. #2400932

    measúnú ar an tionchar ar an gcomhshaol agus, i gcás inarb ábhartha, tuarascáil i gcomhréir le Treoir 2014/52/AE ó Pharlaimint na hEorpa agus ón gComhairle;

    an environmental impact assessment and, where relevant, a report in accordance with Directive 2014/52/EU of the European Parliament and of the Council,

    Commission Decision (EU) 2022/1244 of 13 July 2022 establishing the EU Ecolabel criteria for growing media and soil improvers (notified under document C(2022) 4758) (Text with EEA relevance)

  27. #2438134

    Athbhreithniú ar Mheasúnú ar an Tionchar ar an gComhshaol. https://doi.org/10.1016/S0195-9255(99)00042-6

    Environmental Impact Assessment Review. https://doi.org/10.1016/S0195-9255(99)00042-6

    Commission Recommendation (EU) 2022/2510 of 8 December 2022 establishing a European assessment framework for ‘safe and sustainable by design’ chemicals and materials

  28. #2477566

    Cuirtear Measúnú ar an Tionchar ar an gComhshaol i gcrích sula dtógtar gléasra cumhachta núicléiche, i gcomhréir le Treoir 2011/92/AE.

    An Environmental Impact Assessment is completed prior to the construction of a nuclear power plant, in accordance with Directive 2011/92/EU.

    Commission Delegated Regulation (EU) 2022/1214 of 9 March 2022 amending Delegated Regulation (EU) 2021/2139 as regards economic activities in certain energy sectors and Delegated Regulation (EU) 2021/2178 as regards specific public disclosures for those economic activities (Text with EEA relevance)

  29. #2485127

    Measúnú ar an Tionchar ar an gComhshaol (MTC) mar a shainmhínítear in Airteagal 1(2), pointe (g), de Threoir 2011/92/AE ó Pharlaimint na hEorpa agus ón gComhairle;

    an Environmental Impact Assessment (EIA) as defined in Article 1(2), point (g), of Directive 2011/92/EU of the European Parliament and of the Council;

    Commission Delegated Regulation (EU) 2022/1288 of 6 April 2022 supplementing Regulation (EU) 2019/2088 of the European Parliament and of the Council with regard to regulatory technical standards specifying the details of the content and presentation of the information in relation to the principle of ‘do no significant harm’, specifying the content, methodologies and presentation of information in relation to sustainability indicators and adverse sustainability impacts, and the content and presentation of the information in relation to the promotion of environmental or social characteristics and sustainable investment objectives in pre-contractual documents, on websites and in periodic reports (Text with EEA relevance)

  30. #2660600

    Na tionscadail uile a liostaítear in Iarscríbhinn I a ghabhann le Treoir MTC a thagann faoi raon feidhme an Chonartha, beidh siad faoi réir measúnacht tionchair timpeallachta i gcomhréir le forálacha MTC AE.

    All projects listed in Annex I of the EIA Directive falling under the scope of the Treaty shall be subject to an environmental impact assessment in line with EU EIA provisions.

    Decision No 2021/05 of the Regional Steering Committee of the Transport Community on the revision of Annex I to the Treaty establishing the Transport Community [2023/697]

  31. #2722628

    Ba cheart gach beart sna pleananna téarnaimh agus athléimneachta a dhéanamh i gcomhréir le acquis comhshaoil an Aontais is infheidhme agus le acquis comhshaoil náisiúnta is infheidhme, go háirithe maidir le measúnú ar an tionchar ar an gcomhshaol agus cosaint an dúlra.

    All measures in the recovery and resilience plans should be undertaken in compliance with the applicable Union and national environmental acquis, in particular relating to environmental impact assessment and nature protection.

    Regulation (EU) 2023/435 of the European Parliament and of the Council of 27 February 2023 amending Regulation (EU) 2021/241 as regards REPowerEU chapters in recovery and resilience plans and amending Regulations (EU) No 1303/2013, (EU) 2021/1060 and (EU) 2021/1755, and Directive 2003/87/EC

  32. #2933568

    Tá an Ostair tar éis an chéad chéim a ghlacadh chun measúnú tionchair comhshaoil atá níos cuíchóirithe a thabhairt isteach do thionscadail fuinnimh in-athnuaite.

    Austria has taken a first step in introducing a more streamlined environmental impact assessment for renewable energy projects.

    Council Recommendation of 14 July 2023 on the 2023 National Reform Programme of Austria and delivering a Council opinion on the 2023 Stability Programme of Austria

  33. #3031403

    Cuireadh Measúnú ar an Tionchar ar an gComhshaol (MTC) nó scagadh i gcrích i gcomhréir le Treoir 2011/92/AE.

    An Environmental Impact Assessment (EIA) or screening has been completed in accordance with Directive 2011/92/EU.

    Commission Delegated Regulation (EU) 2023/2486 of 27 June 2023 supplementing Regulation (EU) 2020/852 of the European Parliament and of the Council by establishing the technical screening criteria for determining the conditions under which an economic activity qualifies as contributing substantially to the sustainable use and protection of water and marine resources, to the transition to a circular economy, to pollution prevention and control, or to the protection and restoration of biodiversity and ecosystems and for determining whether that economic activity causes no significant harm to any of the other environmental objectives and amending Commission Delegated Regulation (EU) 2021/2178 as regards specific public disclosures for those economic activities

  34. #3032652

    Cuireadh Measúnú ar an Tionchar ar an gComhshaol (MTC) nó scagadh i gcrích i gcomhréir le Treoir 2011/92/AE.

    An Environmental Impact Assessment (EIA) or a screening has been completed in accordance with Directive 2011/92/EU.

    Commission Delegated Regulation (EU) 2023/2486 of 27 June 2023 supplementing Regulation (EU) 2020/852 of the European Parliament and of the Council by establishing the technical screening criteria for determining the conditions under which an economic activity qualifies as contributing substantially to the sustainable use and protection of water and marine resources, to the transition to a circular economy, to pollution prevention and control, or to the protection and restoration of biodiversity and ecosystems and for determining whether that economic activity causes no significant harm to any of the other environmental objectives and amending Commission Delegated Regulation (EU) 2021/2178 as regards specific public disclosures for those economic activities

  35. #3032691

    Is féidir an acmhainn iompair a fhorbairt freisin mar chuid den Mheasúnú ar an Tionchar ar an gComhshaol (MTC) nó den scagadh dá dtagraítear i bpointe 4.1.

    The carrying capacity can be also developed as part of the Environmental Impact Assessment (EIA) or screening refereed to in point 4.1.

    Commission Delegated Regulation (EU) 2023/2486 of 27 June 2023 supplementing Regulation (EU) 2020/852 of the European Parliament and of the Council by establishing the technical screening criteria for determining the conditions under which an economic activity qualifies as contributing substantially to the sustainable use and protection of water and marine resources, to the transition to a circular economy, to pollution prevention and control, or to the protection and restoration of biodiversity and ecosystems and for determining whether that economic activity causes no significant harm to any of the other environmental objectives and amending Commission Delegated Regulation (EU) 2021/2178 as regards specific public disclosures for those economic activities

  36. #3064955

    Maidir leis an measúnú ar an tionchar ar an gcomhshaol dá dtagraítear i mír 1, déanfaidh gach Páirtí an méid seo a leanas, de réir mar a cheanglaítear leis na dlíthe agus na rialacháin dá chuid:

    With respect to the environmental impact assessment referred to in paragraph 1, each Party shall, as required by its laws and regulations:

    22024A0022

  37. #3064957

    sula dheonóidh sé an t-údarú cuirfidh sé torthaí an mheasúnaithe tionchair ar an gcomhshaol san áireamh a bhaineann leis an éifeacht ar an gcomhshaol;

    take into account the findings of the environmental impact assessment relating to the effects on the environment prior to granting the authorisation;

    22024A0022

  38. #3170382

    Mhaígh siad go ndéanann an tógáil difear do chúig láithreán Natura 2000, agus nach ndearnadh measúnú tionchair comhshaoil air.

    They claimed that the construction affects five Natura 2000 sites and has not undergone an environmental impact assessment.

    Commission Decision (EU) 2024/560 of 8 December 2023 granting the Kingdom of Spain a derogation from certain provisions of Regulation (EU) 2019/943 of the European Parliament and of the Council and of Directive (EU) 2019/944 of the European Parliament and of the Council as regards the Canary Islands (notified under document C(2023) 8638)

  39. #446908

    ciallaíonn ‘Treoir um Measúnacht Tionchair Timpeallachta’ Treoir Uimh. 85/337/CEE an 27 Meitheamh 1985 ón gComhairle maidir le measúnacht a dhéanamh ar éifeachtaí tionscadal poiblí agus príobháideach áirithe ar an gcomhshaol; arna leasú le Treoir Uimh. 97/11/CE an 3 Márta 1997 ón gComhairle, Treoir 2003/35/CE an 26 Bealtaine 2003 ó Pharlaimint na hEorpa agus ón gComhairle agus Treoir 2009/31/CE an 23 Aibreán 2009 ó Pharlaimint na hEorpa agus ón gComhairle;

    Environmental Impact Assessment Directive’ means Council Directive No. 85/337/EEC of 27 June 1985 on the assessment of the effects of certain public and private projects on the environment amended by Council Directive 97/11/EC of 3 March 1997, Directive 2003/35/EC of the European Parliament and of the Council of 26 May 2003 and Directive 2009/31/EC of the European Parliament and of the Council of 23 April 2009;

    PLANNING AND DEVELOPMENT (AMENDMENT) ACT 2010

  40. #446928

    “(4) (a) D’ainneoin fho-ailt (1)(a), (i) nó (l) agus aon rialachán arna ndéanamh faoi fho-alt (2), ní bheidh forbairt a dtosófar uirthi ar theacht i ngníomh don alt seo nó dá éis ina forbairt dhíolmhaithe má cheanglaítear measúnacht tionchair timpeallachta a dhéanamh ar an bhforbairt.

    “(4) (a) Notwithstanding subsections (1)(a), (i) or (l) and any regulations made under subsection (2), development commenced on or after the coming into operation of this section shall not be exempted development if an environmental impact assessment of the development is required.

    PLANNING AND DEVELOPMENT (AMENDMENT) ACT 2010

  41. #447431

    (IV) i gcás nár tosaíodh an fhorbairt, go ndearnadh measúnacht tionchair timpeallachta, nó measúnacht chuí, nó an dá mheasúnacht sin, má ba ghá, sular deonaíodh an cead.

    (IV) where the development has not commenced, that an environmental impact assessment, or an appropriate assessment, or both of those assessments, if required, was or were carried out before the permission was granted.

    PLANNING AND DEVELOPMENT (AMENDMENT) ACT 2010

  42. #447459

    (IV) i gcás nár tosaíodh an fhorbairt, go ndearnadh measúnacht tionchair timpeallachta, nó measúnacht chuí, nó an dá mheasúnacht sin, má ba ghá, sular deonaíodh an cead,

    (IV) where the development has not commenced, that an environmental impact assessment, or an appropriate assessment, or both of those assessments, if required, was or were carried out before the permission was granted,

    PLANNING AND DEVELOPMENT (AMENDMENT) ACT 2010

  43. #447575

    42.—Leasaítear alt 130(5) den Phríomh-Acht trí “faoi réir na Treorach um Measúnacht Tionchair Timpeallachta nó an Choinbhinsiúin Trasteorann” a chur in ionad “de réir na Treorach ón gComhairle nó an Choinbhinsiúin Trasteorann”.

    42.—Section 130(5) of the Principal Act is amended by the substitution of “which subject to the Environmental Impact Assessment Directive or Transboundary Convention” for “which is subject to the Council Directive or Transboundary Convention”.

    PLANNING AND DEVELOPMENT (AMENDMENT) ACT 2010

  44. #447597

    (e) iarraidh ar thuairim scríofa maidir leis an bhfaisnéis a bheidh i ráiteas tionchair timpeallachta faoi alt 173(3), faoi alt 39 d’Acht 2001 nó faoi alt 50 d’Acht na mBóithre 1993;

    (e) a request for a written opinion on the information to be contained in an environmental impact assessment under section 173(3), under section 39 of the Act of 2001 or under section 50 of the Roads Act 1993;

    PLANNING AND DEVELOPMENT (AMENDMENT) ACT 2010

  45. #447666

    “(1) Déanfaidh údarás pleanála nó an Bord, de réir mar a bheidh, measúnacht tionchair timpeallachta maidir le hiarratas ar thoiliú le haghaidh forbartha beartaithe, nó le haghaidh aicme forbartha beartaithe den sórt sin, a bheidh forordaithe le rialacháin faoi alt 176.

    “(1) An environmental impact assessment shall be carried out by a planning authority or the Board, as the case may be, in respect of an application for consent for proposed development, or a class of such proposed development, prescribed by regulations under section 176.

    PLANNING AND DEVELOPMENT (AMENDMENT) ACT 2010

  46. #447688

    55.—Leasaítear alt 174(4)(b) den Phríomh-Acht trí “a bheidh faoi réir na Treorach um Measúnacht Tionchair Timpeallachta nó an Choinbhinsiúin Trasteorann” a chur in ionad “a bheidh faoi réir na Treorach ón gComhairle nó an Choinbhinsiúin Trasteorann”.

    55.—Section 174(4)(b) of the Principal Act is amended by the substitution of “which is subject to the Environmental Impact Assessment Directive or Transboundary Convention” for “which is subject to the Council Directive or Transboundary Convention”.

    PLANNING AND DEVELOPMENT (AMENDMENT) ACT 2010

  47. #447689

    56.—Leasaítear alt 176(1) trí “Déanfaidh an tAire rialacháin chun éifeacht a thabhairt don Treoir um Measúnacht Tionchair Timpeallachta—” a chur in ionad “Féadfaidh an tAire rialacháin a dhéanamh i dtaca leis an Treoir ón gComhairle nó thairis sin—”.

    56.—Section 176(1) is amended by the substitution of “The Minister shall, for the purpose of giving effect to the Environmental Impact Assessment Directive, make regulations—” for “The Minister may, in connection with the Council Directive or otherwise, make regulations—”.

    PLANNING AND DEVELOPMENT (AMENDMENT) ACT 2010

  48. #447746

    (c) an bhfuil mórdhochar déanta don chumas measúnacht a dhéanamh ar thionchair thimpeallachta na forbartha chun críche measúnachta tionchair timpeallachta nó measúnachta cuí agus foráil a dhéanamh maidir le rannpháirteachas an phobail i measúnacht den sórt sin;

    (c) whether the ability to carry out an assessment of the environmental impacts of the development for the purpose of an environmental impact assessment or an appropriate assessment and to provide for public participation in such an assessment has been substantially impaired;

    PLANNING AND DEVELOPMENT (AMENDMENT) ACT 2010

  49. #447795

    (3) Ní bheidh feidhm ag fo-alt (2) maidir le haighneachtaí nó tuairimí a bheidh déanta nó tugtha ag Ballstát nó stát eile is páirtí sa Choinbhinsiún Trasteorann, agus a eascróidh as comhchomhairliúchán de réir na Treorach um Measúnacht Tionchair Timpeallachta nó an Choinbhinsiúin Trasteorann, de réir mar a bheidh, i ndáil le héifeachtaí na forbartha lena mbaineann an t-iarratas ar thoiliú ionaid ar an gcomhshaol.

    (3) Subsection (2) shall not apply in relation to submissions or observations made by a Member State or another state which is a party to the Transboundary Convention, arising from consultation in accordance with the Environmental Impact Assessment Directive or the Transboundary Convention, as the case may be, in relation to the effects on the environment of the development to which an application for substitute consent relates.

    PLANNING AND DEVELOPMENT (AMENDMENT) ACT 2010

  50. #447908

    (b) forléireofar tagairtí san alt sin do mheasúnacht tionchair timpeallachta mar thagairtí do ráiteas leigheasta tionchair timpeallachta nó do ráiteas leigheasta tionchair Natura, nó don dá ráiteas sin, de réir mar a bheidh.

    (b) references in that section to an environmental impact assessment shall be construed as references to a remedial environmental impact statement or a remedial Natura impact statement, or both such statements, as the case may be.

    PLANNING AND DEVELOPMENT (AMENDMENT) ACT 2010