Gaois

This is a static copy of data that is exported from IATE on an occasional basis. It should not be assumed that information provided about an entry here will always correspond to the current version of the entry in IATE. That current version can be checked by clicking on the link on the upper right hand side of each entry. More information »

1 result

  1. EUROPEAN UNION|EU institutions and European civil service|EU institution · EUROPEAN UNION|European construction|enlargement of the Union
    treoirlínte comhchoiteanna Reference Ionstraim Aontachais 1972, Nós Imeachta, IO L73/72, lch. 203 ;Faomhadh an téarma seo mar chuid de Thionscadal Lex
    ga
    gemeinsame Leitlinien
    de
    Definition neue Phase in den Beratungen über Rechtsakte: wenn a) der Entwurf e. Rechtsakts verabschiedungsreif ist oder b) - in bestimmten Fällen - über e. Entwurf politische Einigung erzielt wurde, können die beitretenden Staaten eine Konsultation dazu beantragen; dazu werden ihnen die "gemeinsamen Leitlinen" (also der Entwurf des Rechtsakts in der Version dieser Beratungsphase) zur Unterrichtung übermittelt Reference ---
    Comment CONTEXT: Verfahren für die Information und Konsultation der beitretenden Staaten für die Interimsphase zwischen Abschluss der Beitrittsverhandlungen und Beitritt;DIV: ESI 17/02/2003;UPDATED: RSZ 26/02/2003
    common guidelines
    en
    Definition document which is forwarded to acceding States [ IATE:767391 ] for consultation and which sets out an agreed position on or the text of a proposal, communication, recommendation or initiative that has been transmitted to the Council and might lead to Council decisions with legal effects such as Regulations, Directives, Framework Decisions, Decisions on the basis of relevant Treaty provisions, budget acts and acts concerning international relations Reference Council-EN, based on Council document ST ENLARGEMENT - Arrangements for the interim period 14303/02 http://www.consilium.europa.eu/uedocs/NewsWord/en/misc/73675.doc [16.11.2011] and Council document SN 3827/11 (not available on-line)
    Comment During the interim period between formal conclusion of accession negotiations and entry into force of an accession treaty, consultation between the acceding State and the Union takes place as soon as the preparatory work carried out at Union level with a view to the adoption of decisions by the Council has produced common guidelines enabling such consultations to be usefully arranged.With regard to Croatia, this stage is when the draft act in question is ready for adoption or when it is the subject of a political agreement embodied in a document which is intended for finalisation at a later stage of proceedings.Arrangements for consultation of Croatia in the interim period are set out in Council documents ST 13734/11 and SN 3827/11 (not available on-line).
    orientations communes
    fr
    Comment CONTEXT: élargissement
    OC
    mul