Gaois

This is a static copy of data that is exported from IATE on an occasional basis. It should not be assumed that information provided about an entry here will always correspond to the current version of the entry in IATE. That current version can be checked by clicking on the link on the upper right hand side of each entry. More information »

4 results

  1. INTERNATIONAL RELATIONS|defence · EDUCATION AND COMMUNICATIONS|communications
    lúb rialúcháin Reference Faomhadh an téarma seo mar chuid de Thionscadal Lex
    ga
    Regelkreis
    de
    control loop
    en
    Definition a conception or representation of the elements in the control of a missile,including sensing elements,actuators for control surfaces,missile aerodynamic characteristics,etc. Reference Multilingual Aeronautical Dictionary(AGARD,1980)
    boucle de pilotage
    fr
  2. PRODUCTION, TECHNOLOGY AND RESEARCH|technology and technical regulations · INDUSTRY|electronics and electrical engineering
    ciorcad rialúcháin Reference Faomhadh an téarma seo mar chuid de Thionscadal Lex
    ga
    Steuerkreis | Stellstromkreis | Steuerstromkreis | Regelkreis
    de
    control circuit
    en
    Definition circuit that uses control devices to determine when loads are energized or de-energized by controlling current flow Reference "Toolingu > Reversing Motor Circuits 310. http://www.toolingu.com/definition-460310-34114-control-circuit.html [17.8.2012]"
    circuit de commande | circuit de réglage
    fr
    Definition ensemble des circuits auxiliaires parcourus par le courant qui provoque le fonctionnement de l'appareil à commander Reference VEI 35-5-15
  3. BUSINESS AND COMPETITION|management|management|business management
    timthriall 'pleanáil-déan-seiceáil-gníomhaigh' Reference Téarmeolaithe COM-GA
    ga
    timthriall PDSG Reference Téarmeolaithe COM-GA
    ga
    Definition cur chuige ceithre chéim, dírithe ar an bhfeabhsú leanúnach, de réir leagan amach Deming: - pleanáil (céim an tionscadail) - déan (céim an chur i bhfeidhm) - seiceáil (céim an rialaithe) - gníomhaigh (céim an ghníomhaithe, an oiriúnaithe agus an cheartaithe) Reference "Téarmeolaithe COM-GA; arna bhunú ar:- COM-Comhordú Téarmeolaiochta, agus COM-EN, agus- Líonra na Riarachán Poiblí Eorpach. Common Assessment Framework (CAF) 2020 (27.6.2024) lch. 86"
    Regelkreis „Plan-Do-Check-Act“ | PDCA-Zyklus | Deming-Zyklus | Deming-Kreis
    de
    Definition Kreislauf nach Deming zur Strukturierung von kontinuierlichen Verbesserungsprozessen Reference "Europäisches Zentrum für die Förderung von Berufsbildung > Terminology of European education and training policy > Qualitätszyklus / PDCA-Zyklus (3.7.2024)"
    Comment Die Vorgehensweise erfolgt in vier Teilschritten: P (Plan): Planungsphase; D (Do): Durchführungsphase; C (Check): Überprüfungsphase; A (Act): Handlungs-, Anpassungs- und Korrekturphase.
    PDCA cycle | Plan-Do-Check-Act cycle | plan-do-check-act | PDCA | Plan-Do-Check-Act approach | Deming cycle | Shewhart cycle | Deming wheel | plan–do–check–adjust
    en
    Definition four-stage approach to continuous improvement, as described by Deming:- plan (project phase)- do (execution phase)- check (control phase)- act (action, adaptation and correction phase) Reference "COM-Terminology Coordination and COM-EN, based on: EUPAN. Common Assessment Framework (CAF) 2020 (27.6.2024) p. 86"
    Comment It emphasises that improvement programs must start with careful planning, must result in effective action, be checked and eventually adapted, and must move on again to careful planning in a continuing cycle.
    cycle PDCA | méthode planifier-déployer-contrôler-agir | roue de Deming | cycle Planifier-Réaliser-Vérifier-Agir
    fr
    Definition démarche d'amélioration continue en quatre étapes, telles que décrites par Deming:- planifier (phase de projet)- déployer (phase d'exécution)- contrôler (phase de contrôle)- agir (phase d'action, d'adaptation et de correction) Reference "COM-FR, d'après:Site Prium transition > home > guides > le management de transition > Qu’est-ce que la méthode PDCA ou Roue de Deming ? (6.9.2024)"