ENVIRONMENT|environmental policy|climate change policy|emission trading|EU Emissions Trading Scheme · ENVIRONMENT|environmental policy|climate change policy
- acmhainneacht bhreise Tagairt Faomhadh an téarma seo mar chuid de Thionscadal Lex
- ga
- added capacity
- en
- Sainmhíniú difference between the initial installed capacity of a sub-installation and the installed capacity of that same sub-installation after having had a significant extension determined on the basis of the average of the 2 highest monthly production volumes within the first 6 months following the start of changed operation Tagairt "Commission Decision of 27 April 2011 determining transitional Union-wide rules for harmonised free allocation of emission allowances pursuant to Article 10a of Directive 2003/87/EC of the European Parliament and of the Council (notified under document C(2011) 2772) (2011/278/EU) "
- capacité ajoutée
- fr
- Sainmhíniú la différence entre la capacité installée initiale d’une sous-installation et la capacité installée de la même sous-installation après une extension significative de capacité, déterminée sur la base de la moyenne des deux volumes de production mensuels les plus élevés durant les six premiers mois suivant le début de l’exploitation modifiée Tagairt "2011/278/: Décision de la Commission du 27 avril 2011 définissant des règles transitoires pour l’ensemble de l’Union concernant l’allocation harmonisée de quotas d’émission à titre gratuit conformément à l’article 10 bis de la directive 2003/87/CE [ CELEX:32003L0087/FR ] du Parlement européen et du Conseil, JO L 130 du 17.5.2011, CELEX:32011D0278/FR"