#2526716
PKLD = Buaiclód
PKLD = Peak Load
PKLD = Buaiclód
PKLD = Peak Load
“PKLD’- Buaiclód
‘PKLD’- Peak load
An cumas tarchuradóireachta ainmniúil maidir le buaiclód
Nominal transmission capacity to peak load
Mar shampla, dá ndéanfaí na muirir a bhaineann le maoiniú an tsásra acmhainneachta a nascadh le hídiú leictreachais le linn buaiclód, d’fhéadfaí breathnú air sin mar dhreasacht chun go laghdódh na páirtithe lena mbaineann a n-ídiú le linn buaiclód, as a dtagann gá laghdaithe chun acmhainneacht a chur ar ceant (féach aithris (241)).
For example, linking the charges to finance the CRM to the consumption of electricity during demand peaks could be seen as an incentive for the parties concerned to reduce their consumption during demand peak, leading to a reduced need for capacity to be auctioned (see recital (241)).
Cuirtear bac ar allmhairí leictreachais ós rud é go mbíonn easnamh cumhachta i gcóras cumhachta na hUngáire ag buaiclód agus go mbíonn úsáid inniúlachta tairisceana ar theorainn na hÚcráine coinníollach ar chomhaontú i scríbhinn ón Oibreoir Córais Tarchurtha (OCT) san Úcráin.
Electricity imports are hampered by the fact that the Hungarian power system has power deficit at peak load and the use of tender capacity on the Ukrainian border is conditional on the written agreement of the Transmission System Operator (TSO) in Ukraine.
Ina theannta sin, ba cheart é a bheith indéanta buaiclód agus suiteálacha cúltaca giniúna leictreachais a bhfuil sé beartaithe iad a oibriú faoi bhun 1500 uair oibríochta in aghaidh na bliana mar mheán rollach thar thréimhse 5 bliana a dhíolmhú ón gceanglas teas a sholáthar freisin.
It should also be possible to exempt peak-load and back-up electricity generation installations which are planned to operate under 1500 operating hours per year as a rolling average over a period of five years from the requirement to also provide heat.