Ghlac an banc páirt in dhá mhórthionscadal bonneagair in Crimea - maoiníonn sé ionad nua críochfoirt aeir a thógáil in Simferopol agus i saoráidí giniúna (Balaklavskaya TPP agus Tavricheskaya TPP)
The bank participated in two large infrastructure projects in Crimea – it finances the construction of a new air terminal complex in Simferopol and generation facilities (Balaklavskaya TPP and Tavricheskaya TPP)
#1940461
Ghlac an banc páirt in dhá mhórthionscadal bonneagair in Crimea - maoiníonn sé ionad nua críochfoirt aeir a thógáil in Simferopol agus i saoráidí giniúna (Balaklavskaya TPP agus Tavricheskaya TPP)
The bank participated in two large infrastructure projects in Crimea – it finances the construction of a new air terminal complex in Simferopol and generation facilities (Balaklavskaya TPP and Tavricheskaya TPP)
#2906238
Ghlac an banc páirt in dhá mhórthionscadal bonneagair i bPoblacht na Crimé - maoiníonn sé ionad nua críochfoirt aeir a thógáil in Simferopol agus i saoráidí giniúna (Balaklavskaya TPP agus Tavricheskaya TPP).
The bank participated in two large infrastructure projects in Crimea – it finances the construction of a new air terminal complex in Simferopol and generation facilities (Balaklavskaya TPP and Tavricheskaya TPP).
#2964099
Ghlac an banc páirt in dhá mhórthionscadal bonneagair i bPoblacht na Crimé - maoiníonn sé ionad nua críochfoirt aeir a thógáil in Simferopol agus i saoráidí giniúna (Balaklavskaya TPP agus Tavricheskaya TPP).
The bank participated in two large infrastructure projects in Crimea – it finances the construction of a new air terminal complex in Simferopol and generation facilities (Balaklavskaya TPP and Tavricheskaya TPP).
#2414612
Roghnaíodh OMV Petrom mar an tairgeoir rathúil le haghaidh 4 thionscadal fhótavoltacha (Ișalnița, Tismana Rosia Rovinari, Tismana 1 TPP Rovinari agus Rovinari Est) agus rannchuideoidh sé 50 % le scairchaipiteal gach SPV faoi seach agus is é CE Oltenia a sheasfaidh an ranníocaíocht 50 % atá fágtha.
OMV Petrom has been selected as the winning bidder for 4 photovoltaic projects (Ișalnița, Tismana Rosia Rovinari, Tismana 1 TPP Rovinari and Rovinari Est) and will contribute 50 % to the share capital of each respective SPV while the remaining 50 % contribution will be borne by CE Oltenia.