Gaois

This is a static copy of data that is exported from IATE on an occasional basis. It should not be assumed that information provided about an entry here will always correspond to the current version of the entry in IATE. That current version can be checked by clicking on the link on the upper right hand side of each entry. More information »

2 results

  1. EUROPEAN UNION|EU finance|Community budget
    tréimhse chlársceidealaithe Reference "Rialachán (AE) Uimh. 508/2014 ó Pharlaimint na hEorpa agus ón gComhairle maidir leis an gCiste Eorpach Muirí agus Iascaigh"
    ga
    Context """I bhfianaise dálaí nua nó dálaí gan choinne, ar thionscnamh ón gCoimisiún nó ón mBallstát lena mbaineann, féadfar clár náisiúnta formheasta a athscrúdú agus, más gá, a athchóiriú don tréimhse atá fágtha den tréimhse chlársceidealaithe.""" Reference "Rialachán (AE) Uimh. 508/2014 ó Pharlaimint na hEorpa agus ón gComhairle maidir leis an gCiste Eorpach Muirí agus Iascaigh"
    clárthréimhse Reference "An Chomhairle Eorpach 14 agus 15 Márta 2013. Conclúidí (EUCO 23/13) http://www.consilium.europa.eu/uedocs/cms_data/docs/pressdata/ga/ec/136155.pdf"
    ga
    Context 'Idir an dá linn, is féidir leis na Ballstáit leas a bhaint as an maoiniú atá ar fáil ó na cistí struchtúracha ábhartha uile sa chlárthréimhse reatha...' Reference "An Chomhairle Eorpach 14 agus 15 Márta 2013. Conclúidí (EUCO 23/13) http://www.consilium.europa.eu/uedocs/cms_data/docs/pressdata/ga/ec/136155.pdf"
    Programmplanungszeitraum
    de
    programming period
    en
    Definition seven year period for which the EU's budget and funding priorities are set to achieve the EU's longer-term policy objectives Reference "COM-EN, based on: European Renewable Energy Council. Post-2013 Multiannual Financial Framework. EREC 2010. http://www.erec.org/fileadmin/erec_docs/Documents/Press_Releases/EREC%20Position%20Paper_MFF%202011.pdf [5.12.2011]"
    Comment "The Multiannual Financial Framework (MFF) constitutes the major overhaul of the EU budget, negotiated at seven-year intervals. For each programming period, the MFF establishes the maximum amount and the composition of EU expenditure. It imposes a dual ceiling on expenditure: one for total expenditure and one for each category of expenditure. Bond, London. EU budget. http://www.bond.org.uk/pages/eu-budget.html [5.12.2011]"
    période de programmation
    fr
  2. EUROPEAN UNION|EU finance
    Treoirdhoiciméad maidir le modheolaíocht chomhchoiteann chun measúnú a dhéanamh ar chórais bhainistíochta agus rialaithe sna Ballstáit (clárthréimhse 2007-2013) Reference Faomhadh an téarma seo mar chuid de Thionscadal Lex
    ga
    Guidance document on a common methodology for the assessment of management and control systems in the Member States (2007-2013 programming period) | Guidance document on a common methodology for the assessment of management and control systems in the Member States
    en
    Definition document providing practical guidance on the assessment of management and control systems for the Structural Funds and the Cohesion Fund in the EU Member States Reference "based on:European Commission > Regional Policy, http://ec.europa.eu/regional_policy/archive/conferences/manauth/source_en.htm [17.10.2012]."
    Document de guidance pour une méthodologie commune permettant d’évaluer les systèmes de gestion et de contrôle dans les États membres (période de programmation 2007-2013) | Document de guidance pour une méthodologie commune permettant d’évaluer les systèmes de gestion et de contrôle dans les États membres
    fr
    Definition document qui a a pour objet de fournir des conseils méthodologiques pratiques pour évaluer les systèmes de gestion et de contrôle des Fonds structurels et du Fonds de cohésion dans les États membres de l´UE Reference "Commission européenne > Politique régionale, http://ec.europa.eu/regional_policy/archive/conferences/manauth/source_fr.htm [17.10.2012]"